Payment Terms | L/C, T/T, Western Union |
Supply Ability | 100 Qty/ per month |
Delivery Time | 7-30 work days |
Packaging Details | Loose package |
Material | GB/T 3087-2008 |
Dimension | Depends on capacity |
Weight | Depends on capacity |
Manufacture | Yes |
Thermal efficiency | 96%-98% |
Type | Nature circulation |
Structure | Electric heating |
Style | Vertical/Horizontal |
Output | steam |
Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu |
Model Number | WDR |
Certification | ISO/BV |
Place of Origin | Henan China |
View Detail Information
Explore similar products
Stable Work Electric Heating Steam Boiler Environment Protection Easy Operation
Electric Industrial Steam Boiler Quiet Running Heat Efficient Explosion Proof
Professional Electric Heating Steam Boiler No Pollution Low Energy Conservation
Automatic Industrial Electric Steam Generator , Electric Fired Boiler 1t
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 100 Qty/ per month |
Delivery Time | 7-30 work days | Packaging Details | Loose package |
Material | GB/T 3087-2008 | Dimension | Depends on capacity |
Weight | Depends on capacity | Manufacture | Yes |
Thermal efficiency | 96%-98% | Type | Nature circulation |
Structure | Electric heating | Style | Vertical/Horizontal |
Output | steam | Warranty | 1 year,Lifetime maintain commitment |
Brand Name | Yinyu | Model Number | WDR |
Certification | ISO/BV | Place of Origin | Henan China |
High Light | electric fired boiler ,electric steam boiler |
4t No Pollution High Efficiency Fully Automatic Electric Heating Steam Boiler
Electric heating steam boiler in use, must follow the correct instructions to operate, in fact, every operation process is
very important, because we use, every step as long as a slight poor pool, will be the later product quality and efficiency
caused a certain harm, so say, can not be sloppy, then we will understand its basic instructions.
1, before the opening of the equipment to confirm that the valve position is correct, water supply, power supply is normal.
2, press the power switch, power indicator son, controller alarm (due to water shortage in the boiler) at the same time the water pump began to run, rehydration to ultra-low water level after the controller stop alarm, boiler operation indicator light, automatic water to high water level, water
pump stop.
3, rehydration to the middle water level, furnace pressure is low, the electric tube automatically began to heat.
4, electric heating steam boiler pressure to reach the set value, automatically stop heating, at this time can open the valve, the use of steam.
5, when using steam, the pressure in the furnace drops, down to the lower pressure setting, automatically start heating.
6, the use of steam, the water level in the furnace continues to decline, when the low water level, that is, to start the pump, to the furnace water to the high water level.
7, when the water level is lower than the low water level, the rehydration system is not working properly, after 10 seconds the water level did not reach the low water level electrode,the electric tube stopped heating, such as the water level continues to drop below the ultra-low water level electrode,the controller alarm and stop the furnace protection.Shutdown 1, electric heating steam boiler work finished, press the "power supply" switch to turn off the power supply, power light out, turn off the power supply switch.2, waiting for the pressure gauge down to 0.15 to 0.1MPa, the
sewage valve openforthed, close the water valve.When we operate the electric heating steam boiler, before starting, we must do a good job of inspection, to see if there is an installation problem, or whether the operation is normal, etc. , there must always be a basic commissioning work, and then, after the shutdown, also need a certain amount of maintenance, so, and then familiar with the operation instructions, we have to understand the entire operation process.
WDR4-0.7
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 4 | |
2 | Rated working power | Mpa | 0.7 | |
3 | Rated steam pressure | ℃ | 170 | |
4 | Heating efficiency | % | 99 | |
5 | Output diameter | mm | DN50 | |
6 | Design fuels | / | Electric | |
7 | Safety valve diameter | mm | DN40 | |
8 | Bulk size | mm | 4420×2360×2230 |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.
Boiler application areas
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
2000000-10000000
Employee Number:
80~120
Ecer Certification:
Active Member
Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati... Taikang Yinyu Boiler Manufacturing Co. , Ltd. is the national fixed-point B-class boiler pressure vessel manufacturers, the company's main products are: vertical / horizontal coal, gas, diesel fired steam (hot water) boiler, electric steam boiler (hot water) boiler, 153 kinds of specificati...
Get in touch with us
Leave a Message, we will call you back quickly!