Payment Terms | T/T, L/C |
Supply Ability | 50sets per year |
Delivery Time | 3months |
Packaging Details | Standard Export Package |
Turn-key Project | Yes |
Warranty | 1 Year |
Control | Siemens PLC |
Brand Name | CMT |
Model Number | Customization |
Certification | CE, ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Maize / Corn / Wheat Flour Grinding Production Line , Grain Flour Milling
Automated Stand Up Pouch Filling & Capping Unit Making Machine / Production Line
Electrical Systems Cocoa Bean Powder Making Machine / Production Line
Highly Automatic Floating Fish Food Making Machine / Production Line
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 50sets per year |
Delivery Time | 3months | Packaging Details | Standard Export Package |
Turn-key Project | Yes | Warranty | 1 Year |
Control | Siemens PLC | Brand Name | CMT |
Model Number | Customization | Certification | CE, ISO |
Place of Origin | China | ||
High Light | cup cake production line ,filling and capping machine |
1. Production capacity: 30 tons/day of 75% glucose syrup.
2. Product: 75% dry meter content of glucose syrup
3. Machine list
No | Content | Material | |
1 | 30tons/day glucose syrup production line equipment list | ||
2 | Valve | AISI304+ABS | |
3 | Piping | ||
4 | Electricity | ||
5 | Instrument | DCS automatic control | |
6 | Analytical apparatus | Not including HPLC | |
7 | Spare parts | Two year use |
4. Processing:
4.1Preparation for starch milk:
Refined starch from plant starch was dissolved into the water tank to be adjusted to 19~20Be, then adding Na2CO3 to adjust the PH to 5.4~6.0, and adding α-amylase to be ready for liquefaction.
4.2. Liquefaction:
Put the starch milk prepared to the 1st injector and inject steam directly to the starch milk. Make the temperature rise to 110ºC quickly. After entering the 1st flash evaporator, lower the temperature to 98ºC and keep it for a certain time. The material, after initial hydrolysis, is with a lower viscidity.
The material is then put into the 2nd injector by the pump, its temperature reaching 135ºC quickly, then it gets to the 2nd flash evaporator. The temperature in the 2nd flash evaporator declines to 95ºC. The DE volume of the material would be between 15 and 20 after its staying in the tubular reactor for 90-120 minutes.
4.3. Saccharification:
Put hydrochloric acid into the material after liquefaction and make the PH volume to 4.0-4.5, while lowering the temperature from 90ºC to 60ºC. Add fungal enzymes and glucoamylase into it and keep stirring at that temperature. DE value will be ≥95 after the saccharification period will take 50 to 60hours.
For more information,pls feel free to contact us.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2000
Total Annual:
10000000-50000000
Employee Number:
500~1000
Ecer Certification:
Verified Supplier
Suzhou CMT, an international technology-oriented engineering group company, specialized in Turn-key Projects, providing services of project consulting, engineering design, construction supervision, project management and general contracting. We have strong technical support. There are m... Suzhou CMT, an international technology-oriented engineering group company, specialized in Turn-key Projects, providing services of project consulting, engineering design, construction supervision, project management and general contracting. We have strong technical support. There are m...
Get in touch with us
Leave a Message, we will call you back quickly!