Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 25 days/month |
Delivery Time | 25days |
Packaging Details | wooden box |
Model | LTPM China |
Structure | wall panel, ceiling panel, window, profile, floor, etc. |
Wind resistance | Grade 11 |
Color | Blue or customized |
Driven Type | Electric |
Brand Name | LEADTOP |
Model Number | LTPM China |
Certification | CE certification |
Place of Origin | China |
View Detail Information
Explore similar products
CE LTPM Gmp Clean Room , Pharmaceutical Cleanrooms For Turnkey Project
Modular Pharmaceutical Clean Room With Chemical Resistance Clean Room Panels
Professional Design Dust Free Clean Room Class 5/6/7/8 GMP 100/10000/100000
CE Pharmaceutical Clean Room Heating Ventilating And Air Conditioning HVAC
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 25 days/month |
Delivery Time | 25days | Packaging Details | wooden box |
Model | LTPM China | Structure | wall panel, ceiling panel, window, profile, floor, etc. |
Wind resistance | Grade 11 | Color | Blue or customized |
Driven Type | Electric | Brand Name | LEADTOP |
Model Number | LTPM China | Certification | CE certification |
Place of Origin | China | ||
High Light | Dust Free Sanitizer Cleanroom ,Prefabricated Sanitizer Cleanroom ,Exterior Sandwich Panels Sanitizer Cleanroom |
No Dust Prefabricated Dust Free Room Portable Clean Room And Sanitizer Cleanroom Exterior Sandwich Panels For Sale
Pharmaceutical Modular Clean room project
1) 15 years' experience in clean room area;
2) Clean room turnkey service scope: including design, manufacturing, construction, commission, training and after-sale service;
3) Clean room cosntruction standard(GMP): Class 100-100000; ISO 5-8; Class B-D
4) Customization of clean room: Costomer only need to prepare the land, steel structure, water/ electricity supply, etc
5) Leadtime of clean room project from design to construction:
Design: about 30-60 days;
Manufacture: about 1 month;
Construction: 3-6 months according to site condtions and area.
>Made:Modular wall and ceiling sandwich panel of cleanroom project
-Machine –made economical sandwich panel
-Hand-made modular sandwich panel
> Skin:
- Pre-painted galvanized steel (PPGI) skin
-HPL(Melamine high pressure laminate) skin
> Core insulation material:
-EPS(Expanded polystyrene)
-PUF (Polyurethane foam)
-Rock wool (mineral wool)
-Paper or aluminum honeycomb
-With magnesium gypsum board
If there are other size requirements, it can be customized
The clean room adopts industrial aluminum material (or stainless steel square pass, iron square pass sprayed plastic) as the frame, the fan filter unit (FFU) purifies the air supply, and the anti-static vertical curtain (or tempered glass ionization, acrylic plate) is suspended around it, and its internal purification level Can reach 100-10000 level. It is suitable for areas with high local purification requirements in the operation area.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1996
Total Annual:
1,000,000-3,000,000
Ecer Certification:
Active Member
Service Center All Over world: Headquarter China: LTPM CHINA Add:28th,Jiuan Rd,Jiuli Industrial Zone,Shangwang. Ruian city,Zhejiang,CHINA America: Exclusive Agent and Service center in USA: JRH Pharma R&D Services River Falls, WI,USA Pakistan: Multi Link Add.:Karachi Raki Trade... Service Center All Over world: Headquarter China: LTPM CHINA Add:28th,Jiuan Rd,Jiuli Industrial Zone,Shangwang. Ruian city,Zhejiang,CHINA America: Exclusive Agent and Service center in USA: JRH Pharma R&D Services River Falls, WI,USA Pakistan: Multi Link Add.:Karachi Raki Trade...
Get in touch with us
Leave a Message, we will call you back quickly!