China factories

China factory - Qingdao Huashida Machinery Co., Ltd.

Qingdao Huashida Machinery Co., Ltd.

  • China,Qingdao ,Shandong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Pre-Insulated Pipe Drag Chain Conveyor Pipe In Pipe Assembling Machine
China Pre-Insulated Pipe Drag Chain Conveyor Pipe In Pipe Assembling Machine

  1. China Pre-Insulated Pipe Drag Chain Conveyor Pipe In Pipe Assembling Machine
  2. China Pre-Insulated Pipe Drag Chain Conveyor Pipe In Pipe Assembling Machine
  3. China Pre-Insulated Pipe Drag Chain Conveyor Pipe In Pipe Assembling Machine

Pre-Insulated Pipe Drag Chain Conveyor Pipe In Pipe Assembling Machine

  1. MOQ: 1
  2. Price:
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time 2months
Packaging Details according to the actual condition
Diameter Range 110-2000mm
Cooling Method Water
Warranty 1 year
Extruder HSD-120x38
Usage Pipe-in-Pipe Assembling
Material 38crmoala
Brand Name Huashida
Certification ISO9001
Place of Origin Qingdao,Shandong,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Delivery Time 2months
Packaging Details according to the actual condition Diameter Range 110-2000mm
Cooling Method Water Warranty 1 year
Extruder HSD-120x38 Usage Pipe-in-Pipe Assembling
Material 38crmoala Brand Name Huashida
Certification ISO9001 Place of Origin Qingdao,Shandong,China
High Light Pre-Insulated Pipe Assembling MachinePipe In Pipe Assembling Machine

Pre-Insulated Pipe Drag Chain Conveyor Pipe-in-Pipe Assembling Machine

gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery

 


The equipment consists of a steel pipe chain conveyor and pipe assembling table. The conveyor continuously passes the steel pipe into the PE jacket on the assembling table.

1. Name: HSD-1220# New type circulating double-chain pipe conveyor and assembling machine.
2. Transmission power: 960r/min 4.0KW.
3. Current: 380V 50HZ three-phase four-wire.
4. Transmission type: cycloid reducer, chain transmission.
5. Lubrication: gear oil, industrial butter.
6. Control: Mechanical
7. Installation requirements: horizontal installation.
8. Appearance size: a total of 4 sections 26x1.3x0.65 (m)
9, can wear Ф219-Ф1220 steel pipe.

 

Technical Prameters:

  PE-365/760 PE-420/960 PE-850/1372 PE-960/1680
Main extruder SJ-90/33 SJ-90/33 SJ-120/33 SJ-150/33
Pipe diameter (mm) Φ365-960 Φ420-960 Φ850-1372 Φ960-1680
capacity (kg/h) 550-700 550-700 700-900 800-1200
Installed power (kw) 360 380 440 580
Length (m) 35 36 40 48

 

The huashida insulation pipe production line boasts a core technology that stands at the forefront of China's industry. It showcases numerous innovative points and design concepts, effectively bridging gaps in domestic capabilities. Notably, four pioneering core technologies—the solid-liquid phase separation screw, spiral diverter head, DCL human-machine dialogue technology, and real box external manipulator technology—are either the first or among the earliest implemented in the sector. This groundbreaking product stands as the sole domestic production line capable of producing 1880mm large-diameter insulation pipes, further solidifying its position as a leader in the field.


HDPE Jacket Process Flow:

  1. Vacuum Feeding of PE Granules: The raw PE granules are automatically fed into the system via vacuum suction.
  2. Hot Air Drying: The granules are dried using hot air to remove moisture, ensuring optimal extrusion quality.
  3. Extrusion Plasticizing: The dried granules are plasticized through the extruder, heated and mixed to form a molten plastic mass.
  4. Mold Shaping: The molten plastic is shaped into the desired pipe profile by passing through the extrusion die.
  5. Vacuum Sizing: The pipe is then subjected to vacuum sizing, adjusting its dimensions to precise specifications.
  6. Water Cooling: The pipe is cooled rapidly by immersion in a water tank to solidify its shape and structure.
  7. Pulling Out: The solidified pipe is pulled out of the cooling tank at a controlled speed.
  8. Cutting: The pipe is cut to the desired length using a precision cutting machine.
  9. Carrier Laying-off: The cut pipes are then neatly laid off onto a carrier for further handling or packaging

Composition of Equipments:

  1. Hopper Dryer
  2. Single Screw Extruder
  3. Extrusion Mould Die
  4. Head Bracket
  5. Vacuum Calibration Device
  6. Water Cooling Tank
  7. Haul-off Unit
  8. Planetary Cutting Machine
  9. Pipe Bracket
  10. Loader
  11. PLC (Programmable Logic Controller)

 

The production steps of the insulation layer for a pre-insulated pipe, specifically focusing on the polyurethane (PU) foam insulation, are outlined below in detail:

  1. Formation of the Casing Structure:
    • The steel pipe is first inserted into the high-density polyethylene (HDPE) outer protection pipe, creating a casing structure.
    • Supports are evenly arranged in the annular space between the steel pipe and the HDPE outer pipe to maintain a uniform distance and prevent the two pipes from touching directly.
    • The two ends of the casing are sealed with flanges to ensure that the polyurethane foaming material will be contained within the space during the injection process.
  2. Preparation of the Steel Pipe Surface:
    • Prior to the injection of the insulation material, the surface of the steel pipe undergoes pre-treatment such as shot blasting or blast cleaning. This step removes any impurities, rust, or scale, providing a clean and suitable surface for optimal adhesion of the polyurethane insulation.
    • Additionally, corona treatment of the polyethylene pipe shell's surface may also be performed to enhance its adhesion properties.
  3. Injection of Polyurethane Foaming Material:
    • The casing structure is hoisted onto a foaming platform specifically designed for this purpose.
    • A high-pressure foaming machine is used to inject the polyurethane foaming material into the casing. The material expands and fills the entire annular space between the steel pipe and the HDPE outer pipe.


 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2003

  • Total Annual:

    3000000-5000000

  • Employee Number:

    100~200

  • Ecer Certification:

    Verified Supplier

  1. Our Factory Qingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe...   1. Our Factory Qingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao Huashida Machinery Co., Ltd.
  • 69 Jinsheng Second Road Chengyang District, Qingdao, Shandong, China
  • https://www.pipecoatingline.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement