Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Delivery Time | come to an agreement in respect of the delivery time |
Packaging Details | Packing according to Machine |
Humidity | 85% non condensing |
Insulation Material | Polyurethane Foam |
Control System | PLC |
Cooling Method | Water Cooling |
Power | 3-Phase 380V (-10%, +5%) 50Hz |
Working Speed | 1-10 meters per minute |
Production Speed | 10-20m/min |
Brand Name | HUASHIDA |
Certification | ISO9001 |
Place of Origin | Qingdao,Shandong,China |
View Detail Information
Explore similar products
Polyurethane Spraying Foam Pre Insulated Steel Pipe Making Machine PLC Control
380V/50Hz Spray Polyethylene Winding Insulation Pipe Production Line 20-1600mm
Polyurethane Foam Coating Insulation Pipe Making Machine For Hot / Cold Pipline
Polyurethane Spraying Foam HDPE Winding Protective Jacket Pre insulated Steel
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Delivery Time | come to an agreement in respect of the delivery time |
Packaging Details | Packing according to Machine | Humidity | 85% non condensing |
Insulation Material | Polyurethane Foam | Control System | PLC |
Cooling Method | Water Cooling | Power | 3-Phase 380V (-10%, +5%) 50Hz |
Working Speed | 1-10 meters per minute | Production Speed | 10-20m/min |
Brand Name | HUASHIDA | Certification | ISO9001 |
Place of Origin | Qingdao,Shandong,China | ||
High Light | Epoxy PU Spraying PE Winding Machine ,Prefabricated Pre Insulated Pipe Making Machine |
Liquid Epoxy PU Spraying PE Winding Prefabricated Pre-Insulated Pipe Making Machine
Product description
The polyurethane sprayed polyethylene thermal winding insulation pipe production line independently developed by Huashida, consists of three parts: External shot blasting and derusting production line, polyurethane spraying production line, and PE winding production line. The line has a number of national patents, and the third-party standardized evaluation report has a technology advanced level of 5, reaching the domestic leading level. And won the first set of technical equipment in Shandong Province.
Technological flow:
Upload pipes→pipes conveyor→rust removal→intermediate frequency heating→Epoxy powder coating→Middle layer &polyethylene stripe winding→water cooling→pipes conveyor→ pipe chamfer→unload pipes
5. Trim the pipe ends
Features of the polyurethane spraying PE winding insulation pipe
(1). Density, thermal conductivity, compressive strength and other indices of the polyurethane insulation layer are uniform and consistent. Therefore overall performance of the pipe is superior.
(2). The polyurethane insulation layer is formed by free foaming. Since polyurethane is foamed perpendicular to the axial direction of the pipe, compressive strength of the insulation layer is improved.
(3). The polyurethane insulation layer is formed after spraying. The raw materials are sprayed onto the outer surface of the steel pipe in a liquid form, and then begins to foam. Due to the high reaction activity of the spraying polyurethane raw materials, adhesion between steel pipe surface and polyurethane foam layer is stronger.
(4).Roughness of the surface of polyurethane foam layer is more conducive to increase bonding effect between insulation layer and outer HDPE protective layer.
(5). Polyurethane insulation layer can be sprayed according to the thickness required by customers with a thickness of 15-20mm. Costs can be significantly saved.
(6). As this is a completely automatic production line, Production speed is improved and production quality is consistent and superior.
(7). The polyethylene outer protective layer is formed by circumferential winding, therefore circumferential elongation and tensile strength are significantly improved. Circumferential strength of polyethylene protective layer is stronger.
(8). Prefabricated directly buried insulation pipes produced using the "spray winding" process, with polyurethane insulation layer and polyethylene outer protective layer thickness adjustable according to users needs. The production process does not require additional molds and tooling, making it simple and easy to operate. Due to the absence of expansion stress on the polyethylene outer protective layer during foaming in the "spray winding" process, thickness of the polyethylene outer protective layer can be relatively thinner, reducing costs for customers.
Main accessories
No. | (DN) | The thickness of the insulation layer | Outer casing dia. | Min. thickness of the outer casing |
1 | 500 | 30-60 | 598-658 | 4.5 |
2 | 600 | 30-60 | 700-760 | 5.0 |
3 | 700 | 30-60 | 790-850 | 5.0 |
4 | 800 | 30-60 | 891-951 | 5.5 |
5 | 900 | 30-60 | 992-1052 | 6.0 |
6 | 1000 | 30-60 | 1093-1153 | 6.5 |
7 | 1100 | 30-60 | 1194-1254 | 7.0 |
8 | 1200 | 40-100 | 1316-1436 | 8.0 |
9 | 1400 | 50-100 | 1538-1678 | 9.0 |
10 | 1620 | 50-100 | 1738-1840 | 10.0 |
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
3000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
1. Our Factory Qingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe... 1. Our Factory Qingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe...
Get in touch with us
Leave a Message, we will call you back quickly!