China factories

China factory - Hebei Zexu Pipe Manufacturing Co., Ltd.

Hebei Zexu Pipe Manufacturing Co., Ltd.

  • China,Cangzhou ,Hebei
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee
China 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee

  1. China 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee
  2. China 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee
  3. China 1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee

1 Inch DN15 ASME B16.9 Stainless Steel Reducing Tee

  1. MOQ: 1pcs
  2. Price: 30-370000USD
  3. Get Latest Price
Payment Terms T/T
Supply Ability 586700ton/Year
Delivery Time 6 work days
Packaging Details Export wooden box
Material stainless steel
Shape Reducing
Standard ASME B16.9
Color black or varnished
Pipeline pressure SCH10- XXS
Connection Welding
Production process seamless, welded
Surface treatment black painting, anti-rust oil, sand blast
Brand Name zexu
Model Number 1"-80"
Certification CE API ISO9001
Place of Origin Hebei china

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 586700ton/Year
Delivery Time 6 work days Packaging Details Export wooden box
Material stainless steel Shape Reducing
Standard ASME B16.9 Color black or varnished
Pipeline pressure SCH10- XXS Connection Welding
Production process seamless, welded Surface treatment black painting, anti-rust oil, sand blast
Brand Name zexu Model Number 1"-80"
Certification CE API ISO9001 Place of Origin Hebei china
High Light ASME B16.9 Stainless Steel Reducing TeeDN15 Stainless Steel Reducing Tee304L stainless steel pipe tee

ASME B16.9 Steel Seamless Reducing Tee Chemical Pipeline Connection Pipe Fittings

 

The seamless three-way cold extrusion forming process is also known as the hydraulic bulging process, which is a forming process in which the branch pipe is expanded by the axial compensation of the metal material. The process is to use a special tee machine to inject liquid into a tube blank with the same diameter as the tee main pipe. The two horizontal side cylinders of the tee machine synchronize the centering motion to extrude the tube blank. The volume of the tube blank changes after being squeezed. Smaller, the pressure of the liquid in the billet increases as the volume of the billet becomes smaller. When the pressure required for the expansion of the three-way branch pipe is reached, the metal material moves along the mold cavity under the dual action of the side cylinder and the liquid pressure in the billet. Flow and expand out of the branch pipe. The whole process is formed by the axial compression of the tube blank and the bulging process of the branch part. The metal of the seamless cold extruded tee branch pipe is compensated by the axial movement of the tube blank, so it is also called the axial compensation process.


Three links production process


1. Blanking: First, blanking the standard of the butt welding tee to be produced. Cut the seamless pipe into sections according to the scale.
2. Derusting: Put the cut pipe into the derusting equipment and tumbling and polishing to achieve the purpose of derusting.
3. Kneading: Put the rusted pipe into the mold, and pour water into the pipe from the piston on one side of the mold, so that the pipe gathers toward the center under the pressure effect, and there is a hole under the mold. This hole is a release point for the tube to be kneaded, and then reaches the intention of making a tee.
Four. Trimming: At this moment, the three links can only be called "two links", which means that the two ends are connected, and the central three links are only a raised straight pipe section. Cut off the raised straight pipe section, and then polish and process the groove of the product. In this way, the three links are basically formed.
5. Heat treatment: Put the basically formed tee in a large annealing furnace to smolder it, let it cool naturally before taking it out.
6. ​​Descale: Put the fired tee into the derusting equipment again to remove the oxide scale and ash on the support, and the product is complete. Large diameter tee Large diameter tee

 

BUTT-WELDING PIPE FITTINGS DETAILS

 

MATERIAL Carbon Steel :
ASTM, A234WPB, A234WPC, A420WPL6 ,Q235,10#, A3, Q235A, 20G,16Mn,
DIN St37, St45.8, St52.4,St.35.8,St.35.8.
Stainless Steel:
1Cr18Ni9Ti 0Cr18Ni9 00Cr19Ni10 0Cr17Ni12Mo2Ti
00Cr17Ni14Mo2 304 304L 316 316L
Alloy Steel:
16Mn Cr5Mo 12Cr1MoV 10CrMo910 15CrMo 12Cr2Mo1,
A335P22 St45.8, ASTM A860 WPHY X42 X52 X60 X70
STANDARD ASTM / JIS / DIN / BS / GB/GOST
MODEL 1.Tee(Straight and Reducing) 2.180 DEG Return
3.Elbow (45/90/180 DEG) 4.Cap
5. Reducer(Concentric and Eccentric)
TYPE Seam Or Seamless
ELBOW DEGREE 45 degree, 90 degree, 180 degree
SURFACE Black Paint, Anti Rust Oil, Hot-Dipped Galvanize
WALL THICKNESS SCH5S,SCH10S,SCH10,SCH20,SCH30,SCH40,STD,XS,SCH60,
SCH80,SCH100,SCH120,SCH140,SCH160,XXS,2MM
SIZE 1/2"-48"(Dn15-Dn1200)
CONNECTION Welding
SHAPE Equal, Reducing
CERTIFICATE ISO9001
APPLICATION Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc
RELATED PRODUCTS 1. Carbon steel nipples and sockets 2. Flanges
3. Malleable iron pipe fittings 4. Pipes
5. High-pressure fittings 6. Valves
7. P.T.F.E .thread seal tape 8. Brass fittings
9. Ductile iron pipe fittings 10. Copper fittings
11. Sanitary fittings, etc,. 12. Grooved fittings
Customers’ drawings or designs are available.
PACKAGE 1> 1/2" - 2" in cartons.
2>Above 2" in wooden cases.
Big size is workable by pallets.
DELIVERY DETAILS According to the quantities and specifications of each order.
Normal delivery time is from 30 to 45 days after receiving the deposit.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2016

  • Total Annual:

    10000000-50000000

  • Employee Number:

    >100

  • Ecer Certification:

    Active Member

      Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...       Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...

+ Read More

Get in touch with us

  • Reach Us
  • Hebei Zexu Pipe Manufacturing Co., Ltd.
  • Yanshan County, Cangzhou City, Hebei Province
  • https://www.piping-fittings.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement