Packaging Details | FR or Bulk Ship |
Delivery Time | 45 working days |
Payment Terms | T/T, L/C |
Supply Ability | 120 units per year |
Max.Operating Width | 15m |
Handle Type | Foldable |
Max.Operating Height | 12m |
Platform Load Capacity | 2000Kg |
Gradeability | 25 Degree |
Model | Arch Installation Trolley KGM12200 |
Transportation Dimension (L X W X H) | 11000×3600×4300mm |
Diesel Engine | 153Kw |
Brand Name | POTENTIAL / POTENCY |
Model Number | KGM12200 |
Place of Origin | CHINA |
Certification | ISO9001:2015 |
View Detail Information
Explore similar products
Remote Control Tunnel Arch Installation Trolley With Diesel Engine 125Kw /
Max Operating Height 13m Arch Installation Trolley 13 KW Rock Drill Power
Robotic Arch Installation Trolley 12m Max Operating Height 125Kw / 2200rpm
KGM12200 Robotic Arch Installation Carrier 153KW With Foldable Handle
Product Specification
Packaging Details | FR or Bulk Ship | Delivery Time | 45 working days |
Payment Terms | T/T, L/C | Supply Ability | 120 units per year |
Max.Operating Width | 15m | Handle Type | Foldable |
Max.Operating Height | 12m | Platform Load Capacity | 2000Kg |
Gradeability | 25 Degree | Model | Arch Installation Trolley KGM12200 |
Transportation Dimension (L X W X H) | 11000×3600×4300mm | Diesel Engine | 153Kw |
Brand Name | POTENTIAL / POTENCY | Model Number | KGM12200 |
Place of Origin | CHINA | Certification | ISO9001:2015 |
High Light | 153Kw Arch Installation Equipment ,Arch Installation Equipment 15m |
Arch Installation Trolley KGM12200 for 153Kw Diesel Engine in High Demand Specially for Three Step Tunnel Sections
The KGM12300 Arch Frame Trolley by Potential/Potency is making significant strides in the world of construction equipment. It is the first of its kind in China to have the capability of erecting multiple arches at once, and it is specifically designed for three-step tunnel construction. This innovation is sure to make the construction process faster and more efficient for businesses and contractors alike.
Not only is the KGM12300 Arch Frame Trolley unique in its capabilities, but it also boasts exceptional performance. It is built with high-quality materials, ensuring durability and longevity of use. Its arch frame design provides stability, making it suitable for use in various terrains and conditions.
Moreover, the KGM12300 Arch Frame Trolley is incredibly user-friendly. Its compact size and simple setup make it easy to transport and operate. Its advanced features, such as the hydraulic system, add to its ease of use and efficiency. It is a testament to Potential/Potency's commitment to developing effective and user-friendly construction equipment.
All in all, the KGM12300 Arch Frame Trolley is a game-changer in the construction industry, revolutionizing the way tunnels are built. Its unique design, outstanding performance, and user-friendly features make it a must-have for any business or contractor looking to optimize their construction process.
Adopting Engineering Chassis and Four-wheel Drive: This vehicle uses an engineering chassis and four-wheel drive system which ensures that it has a strong climbing ability. Additionally, it is equipped with four-wheel steering which allows for a small turning radius.
Three Working Arm Frame with Folding and Telescopic Structure: This vehicle has a three working arm frame, which includes an upper arm, middle arm, and lower arm. The middle arm is extendable. The arm frame can be folded and returned to the frame as a whole in transportation status.
Dual Work Platform with Arch Dragging and Clamping Device: The vehicle has a dual work platform with an arch dragging and clamping device. Additionally, the left arm has a crane function for accompanying the vehicle.
Multifunctional Platform for the Main Arm: The main arm has a multifunctional platform which allows it to simultaneously clamp 1-3 arches and quickly lift them into place. This makes transporting and forming multiple arches with the vehicle possible.
Controller Control and Large Screen Display: The vehicle is equipped with a controller control system with a large screen display of parameters. Additionally, the system has real-time monitoring of system operation status.
Arm Frame Control Intelligent Assistance System: The arm frame control has an intelligent assistance system which helps to achieve rapid positioning of the arch frame and improve efficiency.
No. | Items | Unit | Data | |
---|---|---|---|---|
1 | Whole Machine | Total weight | 29 t | |
Travel speed | km/h | 0 ~ 20 | ||
Walking mode | / | Tyre | ||
Traction | / | 4 wheels drive | ||
Steering | / | 4 wheels steering | ||
Minimum turning radius | m | inner 3.0/outer 7.5 | ||
Ground clearance | mm | 400 | ||
Grade ability | ° | 25 | ||
Max. operating height | m | 12 | ||
Max. operating width | m | 15 | ||
Transportation dimension (L x W x H) | m | 11000×2800×4300 | ||
2 | Diesel Engine | Type | 6 cylinder water cooled | |
Rated power | KW | 153 | ||
3 | Motor | Rated power | KW | 90 |
4 | Boom | Max. working length | m | 12 |
Max. extended length of main boom | m | 14 | ||
Max. extended length of auxiliary boom | m | 16.5 | ||
Pallet payload | kg | 2000 | ||
Platform payload | kg | 400 | ||
Payload of lifting mechanism | kg | 2000 | ||
Platform of mini crane on platform | kg | 400 | ||
5 | Electrical System | Operating mode | / | Wireless |
Control mode | / | Controller | ||
6 | Cable Reel | Power supply | / | 380V/50HZ (customizable) |
Current | A | 240 |
The tunnel arch installation trolleys KGM12200 are widely used in various construction scenarios such as railway tunnels, highway tunnels, urban underground pipe galleries, mining tunnels, etc.
Railway tunnel: In railway tunnel construction, the tunnel arch installation trolley quickly and accurately installs the arch, provides early support structure and ensures construction safety. In railway tunnel projects with complex mountainous terrain, the role of the trolley is particularly important.
Highway tunnel: Whether it is the construction of highway tunnels or ordinary highway tunnels, the tunnel arch installation trolley can assist in completing the arch installation work, improving construction efficiency and quality.
Urban underground pipe gallery: Trolleys are used to install arches in the construction of urban underground pipe galleries, enhancing the stability of the structure, and are suitable for construction in deeper underground spaces.
Mining tunnels: Tunnel arch installation trolleys are used to strengthen support, control surrounding rock deformation and ensure construction safety during the construction of metal mines and coal mine tunnels.
Product Packaging:
Shipping Information:
Q: What is the brand name of the Arch Installation Trolley?
A: The brand name is POTENTIAL or POTENCY.
Q: What is the model number of the Arch Installation Trolley?
A: The model number is KGM12200.
Q: Where is the Arch Installation Trolley manufactured?
A: The Arch Installation Trolley is manufactured in China.
Q: What certification does the Arch Installation Trolley have?
A: The Arch Installation Trolley is certified with ISO9001:2015.
Q: What is the minimum order quantity for the Arch Installation Trolley?
A: The minimum order quantity is 1 unit.
Q: What is the price of the Arch Installation Trolley?
A: The price is negotiable.
Q: What are the packaging details for the Arch Installation Trolley?
A: The packaging details are FR or Bulk Ship.
Q: What is the delivery time for the Arch Installation Trolley?
A: The delivery time is 45 working days.
Q: What are the payment terms for the Arch Installation Trolley?
A: The payment terms are T/T or L/C.
Q: What is the supply ability for the Arch Installation Trolley?
A: The supply ability is 120 units per year.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1992
Total Annual:
15000000-50000000
Employee Number:
300~500
Ecer Certification:
Verified Supplier
Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ... Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ...
Get in touch with us
Leave a Message, we will call you back quickly!