Packaging Details | 2 Units in 1*40'HQ |
Delivery Time | 30 working days |
Payment Terms | T/T, L/C |
Supply Ability | 120 units per year |
Packing size (mm) | 9515*1100*2020 |
Application | Concrete Spiders |
Weight with counterweight | 5.5t |
Elevation angle ° | 0~85° |
Max Horizontal Reach | 15~17m |
Weight without counterweight | 3.75t |
Boom Length (mm) | 6650/5650/4700 |
Power of Motor | 5.5Kw |
Brand Name | POTENTIAL / POTENCY |
Model Number | HG17 |
Place of Origin | CHINA |
Certification | ISO9001:2015 |
View Detail Information
Explore similar products
15-17m Max Horizontal Reach Spider Concrete Placing Boom for Accurate Concrete
31.7m Max. Reach 28Mpa Hydraulic Concrete Placing Boom with 360 Degree Slewing
HG32Bb Concrete Placing Boom 28Mpa Pressure Cable Radio Remote Control Ideal for
ESSO NUTO H46 Or H32 Hydraulic Oil Type Climbing Concrete Placing Boom with 360°
Product Specification
Packaging Details | 2 Units in 1*40'HQ | Delivery Time | 30 working days |
Payment Terms | T/T, L/C | Supply Ability | 120 units per year |
Packing size (mm) | 9515*1100*2020 | Application | Concrete Spiders |
Weight with counterweight | 5.5t | Elevation angle ° | 0~85° |
Max Horizontal Reach | 15~17m | Weight without counterweight | 3.75t |
Boom Length (mm) | 6650/5650/4700 | Power of Motor | 5.5Kw |
Brand Name | POTENTIAL / POTENCY | Model Number | HG17 |
Place of Origin | CHINA | Certification | ISO9001:2015 |
High Light | Heavy Duty Concrete Placing Boom ,5.5Kw Concrete Placing Boom ,5.5t Concrete Placing Boom |
5.5Kw Motor Power Concrete Placing Boom with 5.5t Weight and Heavy-Duty Concrete Spiders
Fixed and Climbing Design
By using the reserved hole fixing technology in the floor slab, the fabric pole tower body is fixed in the reserved hole of the floor slab through the frame (requiring two layers of fixation), which can achieve continuous pouring of two floors.
Support hydraulic self climbing function, automatically adjust as the building floor rises, without relying on tower crane lifting, simplifying the operation process.
Safety Protection Device
Equipped with multiple safety protection measures such as hydraulic cooling device, overload protection, safety lock, emergency stop button, etc., to reduce operational risks.
The fixed structure design of the floor slab avoids trampling damage to the floor steel mesh, ensuring construction safety.
Weight without counterweight | 3.75t |
Packing size (mm) | 9515*1100*2020 |
Boom Length (mm) | 6650/5650/4700 |
Power of Motor | 5.5Kw |
Weight with counterweight | 5.5t |
Application | Concrete Spiders |
Elevation angle ° | 0~85° |
Max Horizontal Reach | 15~17m |
<strong>Efficient construction</strong>
One time fixation can complete two layers of pouring, reducing equipment installation time and improving efficiency.
No need for structural reserved holes or complex climbing processes, simplifying construction procedures and shortening the construction period.
<strong>Intelligence and stability</strong>
Wireless remote control operation reduces manual intervention and lowers the risk of high-altitude operations.
The combination of hydraulic system and high-quality components ensures the long-term stable operation of the equipment.
Our Product Technical Support and Services for the Concrete Placing Boom include:
- Installation guidance and support
- Troubleshooting assistance for any technical issues
- Maintenance recommendations and schedules
- Training programs for operators
- Access to our online resources and manuals
Q: What is the brand name of the Concrete Placing Boom?
A: The brand name of the Concrete Placing Boom is POTENTIAL / POTENCY.
Q: What is the model number of the Concrete Placing Boom?
A: The model number of the Concrete Placing Boom is HG17.
Q: Where is the Concrete Placing Boom manufactured?
A: The Concrete Placing Boom is manufactured in CHINA.
Q: What certification does the Concrete Placing Boom have?
A: The Concrete Placing Boom is certified with ISO9001:2015.
Q: What is the minimum order quantity for the Concrete Placing Boom?
A: The minimum order quantity for the Concrete Placing Boom is 1 Unit.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1992
Total Annual:
15000000-50000000
Employee Number:
300~500
Ecer Certification:
Verified Supplier
Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ... Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ...
Get in touch with us
Leave a Message, we will call you back quickly!