Payment Terms | T/T |
Supply Ability | 10 sets /30 days |
Delivery Time | 2 to 3 weeks |
Packaging Details | wooden crate |
Color | gray |
simultaneously measurable | 4-16 power supply products |
Altitude | 1.7m |
Customizable | Yes |
Product Usage | Automatic Testing for Adapter Products |
Function | Rapidly test the performance of various power supply products. |
Brand Name | Topfer |
Model Number | Top-Smart 1100 |
Place of Origin | China |
View Detail Information
Explore similar products
Automatic Mobile Power Bank / Charger Test System For Comprehensive Performance
HIghly Accurate Measurements Power Automatic Test System High Performance
Power Supply ATE Test Equipment Machine Automated Assembly Line Customized
1.7m IEC 62301 Automatic Power Supply Test System Equipment For PCB
Product Specification
Payment Terms | T/T | Supply Ability | 10 sets /30 days |
Delivery Time | 2 to 3 weeks | Packaging Details | wooden crate |
Color | gray | simultaneously measurable | 4-16 power supply products |
Altitude | 1.7m | Customizable | Yes |
Product Usage | Automatic Testing for Adapter Products | Function | Rapidly test the performance of various power supply products. |
Brand Name | Topfer | Model Number | Top-Smart 1100 |
Place of Origin | China | ||
High Light | Vehicle Charger Power Supply Test System ,QC4.0 Power Supply Test System ,QC4.0 automatic testing machine |
Vehicle Charger Testing Equipment, Power Supply Testing System, Fast Charging QC2.0/3.0/4.0 Testing
Features of the Fast Charging Charger Testing System:
Efficiency:
Accuracy:
Versatility:
Usability:
Reliability:
Safety:
These characteristics make the fast charging charger testing system widely applicable in production lines, R&D departments, and after-sales services, improving product quality and production efficiency.
Test Items of the Fast Charging Charger Testing System:
Test items | Test items |
DC output voltage | Input voltage ramp |
DC output current | Input freq. ramp |
Peak-Peak noise | Tracking |
Transient response time | Short circuit test |
Transient spike | Short circuit current |
Voltage regulation | OV protection |
Current regulation | UV protection |
Turn ON time | OL protection |
Rise time | OP protection |
Fall time | In-test adjustment |
Hold-up time | AC cycle drop out |
Inrush current test | PLD simulation |
Power good signal | GPIB read/write |
Power fail signal | 232 read/write |
P/S ON signal | USB read/write |
Power up sequence | TTL signal control |
Power off sequence | Relay control |
Effciency | Bar code scan |
Input RMS current | Dynamic test |
Input power | DC Current under C.V.Mode |
Input power factor | DC : specification under C.P.Mode |
Company Details
Business Type:
Manufacturer
Year Established:
2005
Total Annual:
250-350
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE... Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE...
Get in touch with us
Leave a Message, we will call you back quickly!