Payment Terms | T/T 50% as deposit 50% before shipment |
Supply Ability | 1200-1500 units per month |
Delivery Time | Normally, simple parts,5- 7 workdays, complicated parts 7- 15 workdays, according QTY and the complexity of drawing. |
Packaging Details | PE film covered first, Plastic box, then carton last. |
Comcoment Name | Precision Wire - EDM SKD11 CNC Machined Components WIth Material Certification |
Comcoment Material | SKD11 from Japan or OEM as customer requirement |
Material Brand | HTTACHI |
Accuracy of grinding | 0.001 mm |
Accuracy of EDM | 0.002 mm |
Drawing format | You supply can be accepted |
Brand Name | Kingrui |
Model Number | KR005 |
Certification | ISO9001: 2008 |
Place of Origin | Dongguan, China( Mainland) |
View Detail Information
Explore similar products
Precision Wire Cutting Machned Mold Parts HSS Materials Ra 0.4 um Surface
Steel Mold Parts Machined According to Customer's Drawings , Cnc Lathe
Small CNC Machine Products Mold Components Stainless Steel Grinding Machining
OEM CNC Machined Components Stainless Steel Grinding Machining
Product Specification
Payment Terms | T/T 50% as deposit 50% before shipment | Supply Ability | 1200-1500 units per month |
Delivery Time | Normally, simple parts,5- 7 workdays, complicated parts 7- 15 workdays, according QTY and the complexity of drawing. | Packaging Details | PE film covered first, Plastic box, then carton last. |
Comcoment Name | Precision Wire - EDM SKD11 CNC Machined Components WIth Material Certification | Comcoment Material | SKD11 from Japan or OEM as customer requirement |
Material Brand | HTTACHI | Accuracy of grinding | 0.001 mm |
Accuracy of EDM | 0.002 mm | Drawing format | You supply can be accepted |
Brand Name | Kingrui | Model Number | KR005 |
Certification | ISO9001: 2008 | Place of Origin | Dongguan, China( Mainland) |
High Light | machined metal parts ,cnc machine parts |
Precision Wire - EDM SKD11 CNC Machined Components WIth Material Certification
Introiduction of CNC machined component
1. Material: SKD11, it is a kind of high carbon high chromium alloy tool steel after heat treatment has very high hardness and abrasion resistance, with hardenability, good stability and size, suitable for making cold mold with high precision long life and plastic mold of molding thermosetting.
2. Machining: This one CNC machined component, which is on display now, is finished by three processes, Namely, surface grinding, wire EDM, and precision EDM.
3. Machined Equipements: Japan Sodick supper- mirror and electro-discharge machine, surface- grinding machine, wire- EDM.
4. Surface finish: polishing, mirror polishing, DLC coating, PVD coating and more.
5. Applied software: Pro/E, Auto CAD 2000,solid work 2001,CAXA,UG,CAD,CAM
6. Product weight: 0.02kg to 100kg or according to your drawings.
Specification of CNC Machined Components
Equipments |
|
Precision Processing | CNC turning, milling, grinding, wire EDM cutting,EDM, etc. |
Material |
Brass, Aluminum, Steel, High-speed Steel, Copper and iron etc.
|
Surface Finish |
Polishing Mirror polishing PVD coating DLC coating more... |
Dimension |
According to 2d/ 3d drawing or sample
|
Tolerance |
+/- 0.001-- 0.005 mm
|
Color |
Customer specified
|
Lead Time |
* 5-15 working days for CNC machined component
|
Packing |
* Eco- friendly PE film / plastic bag/ strong Carton boxes or standard export wooden case * Customer appointed
|
Shipping
|
* By sea / air / economic express. e.g DHL/ UPS/ TNT/ Others * Customer appointed |
Terms of Payment |
Main term is TT
|
Delivery
1, We have cooperation with China Post, DHL, UPS, FEDEX, EMS and so on, we may give you some advice of transportation.
China Post: For the package under 2kgs, Usually need 25-35days to get the package.
SHL, UPS, Fedex IE: For the package over 2kgs. If the package is under 20kgs, Shipping cost will be little high, For the package is over 20kgs, these express will be more economic.
Usually need 5-9days for the packages can be arrived. Tracking number can be offered after the package be sent out(for some country and area, It has remotes and contacted with us to check your area to check, for the remotes will cost remotes fee)
EMS: Most safety shipping way, Usually need 7-10 days to get the package.
Fedex IP: Most fast shipping way, Usually need 2-5 days to get the package, Especially for USA customers. Just 2-3 days to get the package. But cost little high.
2, If the order is big, we usually suggest you to use Air Freight, please inform us the nearest airport or port, we can help you check the best cost before shipment.
3, During or near to the Holidays and Festival, as so many packages be stucked at the customs, some packages will be delayed for few days, please kindly understand this.
4, All of the balance need to be paid before the shipment or bill of leding.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2005
Total Annual:
1 800 000-2 000 000
Employee Number:
36~50
Ecer Certification:
Active Member
Kingrui Profile Dongguan Kingrui Precision Mould Co., ltd was established in 2005. It is a middle-size tooling parts manufacturer in China, mainly serving for plastic injection mold and industrial cutting tools, acrossing automotive, aviation, medical, ,electronics, electrical connector... Kingrui Profile Dongguan Kingrui Precision Mould Co., ltd was established in 2005. It is a middle-size tooling parts manufacturer in China, mainly serving for plastic injection mold and industrial cutting tools, acrossing automotive, aviation, medical, ,electronics, electrical connector...
Get in touch with us
Leave a Message, we will call you back quickly!