Payment Terms | L/C, T/T |
Supply Ability | 10000 pieces/ month |
Delivery Time | 1--15 days |
Packaging Details | wooden box |
Material | glass fiber reinforced plastic and aluminium alloy |
Application | Emergency flood prevention |
Feature | fast , cheap environmentally friendly |
Brand Name | SPEK |
Certification | ISO |
Place of Origin | CHINA JIANGSU |
View Detail Information
Explore similar products
Retractable without construction aluminium alloy flood baffle for Hospitals
Customized Retractable without construction aluminium alloy flood baffle
Quick Absorbing Water Activated Barrier Preventing Flood Bag
Aluminum Alloy Profiles Flood Defence Barrier for Offices Schools Hospitals
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 pieces/ month |
Delivery Time | 1--15 days | Packaging Details | wooden box |
Material | glass fiber reinforced plastic and aluminium alloy | Application | Emergency flood prevention |
Feature | fast , cheap environmentally friendly | Brand Name | SPEK |
Certification | ISO | Place of Origin | CHINA JIANGSU |
High Light | Environmentally friendly flood embankment ,Portable flood embankment ,Fast flood embankment |
Portable fast environmentally friendly flood embankment
product recommendation
The flood control embankment is composed of water baffle, assembled triangular support and quick mounted beam. Flood control embankment is a temporary embankment that is repaired at the top of the adjacent water surface in order to prevent the flood from overflowing the top of the embankment. It is a kind of on-site assembly embankment. The emergency equipment reserve, usually used as a watershed or fixed-point warehouse, is also directly used for mobile emergency teams in various provinces and cities.
Product usage
Mainly used for sandy soil loam, loam, clay and concrete, asphalt and other soft levees for emergency flood prevention risk. To prevent flooding caused by low or excessive flood of embankments and DAMS, and by rising river water levels exceeding the top of embankments. Prevent the high
water level in flood season, due to the strong wind and large waves caused by the river roof of the dike caused by local wave danger
Product feature
Prefabricated slab dam flood control sub-levee thinking mode, abandon the traditional construction materials, technology, is a new, fast, cheap, environmentally friendly disaster prevention and mitigation equipment. It has the characteristics of water control according to water, fast, flexible, adaptable, easy to transport, low cost, reuse, green environmental protection and so on.
Product index
Each length of the embankment is ≥10M, the unit width is ≥1M, the height is ≥1M, and the water retaining depth is ≥1M. The water retaining panel is made of fiberglass steel, and the U-shaped groove is inserted into each other. The triangular bracket is made of aluminum alloy with anodized surface coloring.
1: Made of high quality glass steel ,strong, wear-resistant,pressure resistant , impact resistant ,aging resistant.
2:Aluminum alloy bracket,surface anodized coloring . High strength ,corrosion resistance.
1: Fast handing,reuse.
2: According to water control ,the dam group is flexible and adaptable.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
2015
Total Annual:
100-300
Employee Number:
1~10
Ecer Certification:
Verified Supplier
We are a trading company specialized in machinery and equipment export,established in 2015. We have rich trade experience and professional team. The main business includes : intelligent hanging system, clothing industry machinery and equipment,fruit cleaning and waxing machinery, PE f... We are a trading company specialized in machinery and equipment export,established in 2015. We have rich trade experience and professional team. The main business includes : intelligent hanging system, clothing industry machinery and equipment,fruit cleaning and waxing machinery, PE f...
Get in touch with us
Leave a Message, we will call you back quickly!