Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 10000 Set/Sets per Month |
Delivery Time | 7~15 working days |
Packaging Details | Carton packaging |
Weight | 11~22.8KG |
Application | PC,home |
Capacity | 1~3KVA |
Input voltage | 220V 230V 240V |
Output | 220V 230V 240V |
Product name | 1~3kva High Frequency Online UPS |
Brand Name | ZGD |
Model Number | C1~3K |
Certification | CE ROHS |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
100-240VAC 10kw High Frequency Online UPS 10kva Pure Sine Wave Snmp Card
High Frequency Online UPS 30KVA 24KW With External Batteries Backup Power
three Phase 27000W 30000VA High Frequency Online UPS Uninterruptible Power
8000w 10000va Ups System Online High Frequency Ups For Medical Appliance
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 10000 Set/Sets per Month |
Delivery Time | 7~15 working days | Packaging Details | Carton packaging |
Weight | 11~22.8KG | Application | PC,home |
Capacity | 1~3KVA | Input voltage | 220V 230V 240V |
Output | 220V 230V 240V | Product name | 1~3kva High Frequency Online UPS |
Brand Name | ZGD | Model Number | C1~3K |
Certification | CE ROHS | Place of Origin | Guangdong, China |
High Light | 220V Online Single Phase UPS ,3KVA Single Phase UPS ,220V Backup Power Supply |
High Frequency 220V Online Single Phase UPS Backup Power Supply
High Frequency Ups Single Phase 220V Online Computer Ups Backup Power Supply
Connection of external battery is ABSOLUTELY CRITICAL. Any mistake may result in serious injure of electric shock or fire, damage of product:. below steps must be strictly followed :
l The external battery bank must have a cut-off device, like circuit breaker or switch with fuses.
l TURN OFF the cut-off device , make sure no harmful voltage can be touched on the connector.
l Use only battery bank of correct voltage, check the product rating label for correct information.
l Choose Wire with sufficient current rated , prepared well the terminal
l CHECK THE POLARITY of battery bank, fix wires of correct polarity to the battery bank with proper color and clear label for distinguish the polarity.
l Securely Plug / Fix the other end of the cable to UPS
l Check the polarity of the wiring and fastness of the connection
l Powered the UPS by turning on the cutoff device device
Specification
Model item | 1K(R) | 1K(R)S | 2K(R) | 2K(R)S | 3K(R) | 3K(R)S | 6K | 6K(R)S | 10K | 10K(R)S | |
Rated power | 1000VA/800W | 2000VA/1600W | 3000VA/2400W | 6kVA/5.4kW | 10kVA/9kW | ||||||
AC Input | Input system | Single phase (L/N+PE) | |||||||||
| Nominal voltage | HV: 208/220/230/240Vac LV:100/110/120/127Vac | |||||||||
| Frequency | 50/60Hz | |||||||||
| Voltage range | HV: 90~300VAC±5VAC LV: 60-145Vac±3VAC | |||||||||
| Frequency range | (40~70)±0.5Hz | |||||||||
| Input power factor | >0.99 | |||||||||
| Bypass Voltage Range | HV: 115~285VAC×(1±3%) LV: 80~140VAC×(1±3%) | |||||||||
Battery Input | Nominal Voltage | 24V | 36V | 48V | 72V | 72V | 96V | 192V | 192V | 192V/240V | |
| Battery Capacity & Quantity | 12V/9AH x 2pcs | External | 12V/9AH x 4pcs | External | 12V/9AH x 6pcs | External | 12V/9AH x 16pcs | External | 12V/9AH x16/20pcs | External |
| Backup Time | Half loaded≥8minutes, Full loaded ≥3minutes(standard) | Half loaded≥6minutes, Full loaded ≥3minutes(standard) | ||||||||
| Battery charger time | Charger to 90% battery capacity in 5 hours(standard) Dependent on the capacity of external batteries (long backup time) | |||||||||
AC Output | Output system | Single phase (L/N+PE) | |||||||||
| Inverter Mode Output voltage | HV:208/220/230/240Vac±2% LV:100/110/120/127Vac±2% | |||||||||
| Waveform | Sine Wave THD<3% (linear load) THD<7% (nonlinear load) | Sine Wave THD<2% (linear load) THD<5% (nonlinear load) | ||||||||
| Output frequency | 50/60±4Hz (Sync mode) 50/60Hz±1% (Fix Freq. mode) |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Total Annual:
1000000-5000000
Employee Number:
zgd001~zgd500
Ecer Certification:
Site Member
As a manufacturer with over 10 years of experience, Shenzhen ZGD Technology Co., Ltd. has more than 10 production lines which can produce 100,000 pieces of UPS every month. Over 10% of our staff members are engineers and professional technicians and more than 400 are skilled workers. Our company spe... As a manufacturer with over 10 years of experience, Shenzhen ZGD Technology Co., Ltd. has more than 10 production lines which can produce 100,000 pieces of UPS every month. Over 10% of our staff members are engineers and professional technicians and more than 400 are skilled workers. Our company spe...
Get in touch with us
Leave a Message, we will call you back quickly!