Payment Terms | T/T, D/A, D/P, Western Union, MoneyGram, L/C |
Supply Ability | 8000 piece per month |
Delivery Time | 3-7day |
Packaging Details | cartons,wooden cases |
OEM | Support |
Application | For air, water, sewer and gas pipelines |
Surface Treatment | Spray-Paint |
Connection | take a plug (in a tube) |
Size | Customized Size |
manufacturers | Yes |
Product drawings | Offer |
Brand Name | Liang He |
Model Number | AY |
Certification | ISO 9001 |
Place of Origin | Henan,China |
View Detail Information
Explore similar products
DN250 PN16 Ductile Cast Iron Di Gibault Joint For PVC Pipe
Carbon Steel Flexible Universal Dresser Coupling Blue Epoxy Coated Joints
DN125 PN16 Manufactures Ductile Iron Flexible Universal Broken Joint Dresser
Ductile Cast Iron Dl Gibault Joints Universal Coupling For PVC Pipes
Product Specification
Payment Terms | T/T, D/A, D/P, Western Union, MoneyGram, L/C | Supply Ability | 8000 piece per month |
Delivery Time | 3-7day | Packaging Details | cartons,wooden cases |
OEM | Support | Application | For air, water, sewer and gas pipelines |
Surface Treatment | Spray-Paint | Connection | take a plug (in a tube) |
Size | Customized Size | manufacturers | Yes |
Product drawings | Offer | Brand Name | Liang He |
Model Number | AY | Certification | ISO 9001 |
Place of Origin | Henan,China | ||
High Light | flexible flanged gibault joint ,flexible gibault joint installation ,universal flanged gibault joint |
DN150 wide range flexible gibault joints ductile cast iron DI universal coupling for PVC pipes
Product Introduction
Universal couplings and flange joints, suitable for DN40-DN600 specifications, steel pipes, ductile iron pipes and plastic pipes with grades PN6, PN10 and PN16. It has the ability to connect to different kinds of pipes. It is mainly used to absorb axial displacement, withstand axial pressure and thrust within the allowable displacement range, and loosen the pipeline connection.
Features
1. Earthquake-resistant, impact-resistant, noise-reducing
2. Reduce the weight of the pipeline
3. Save pipeline space
4. Cost-effective
5. Easy maintenance
Product material
1. The pipe material is: Cast iron pipe, steel pipe, PVC/PE pipe
2. Coating: Support customization
3. Rubber ring material: EPDM, nitrile rubber, etc
4. Bolt material: 4.8 grade electro-galvanized, 8.8 grade hot-dip galvanized, SS304,SS316 etc
Product parameters
DN | DW external diameter | extermal dimension | N-Th | ||||||
Length | D | 0.25-1.6Mpa | 2.5-6.4Mpa | ||||||
L1 | L | ||||||||
65 | 76 | 180 | 208 | 155 | 4-M12 | 4-M12 | |||
80 | 89 | 165 | |||||||
100 | 108 | 195 | |||||||
100 | 114 | 195 | |||||||
125 | 133 | 225 | |||||||
125 | 140 | 225 | 4-M16 | ||||||
150 | 159 | 220 | 225 | 4-M16 | 6-M16 | ||||
150 | 168 | 225 | |||||||
200 | 219 | 310 | |||||||
225 | 245 | 335 | |||||||
250 | 273 | 223 | 375 | 6-M20 | 8-M20 |
Tips:The above data is only part of the data, if you need a special size, please contact us.
Installation steps and precautions for the product
1. Inspection and preparation: Before installation, the model, specification and pipeline configuration of the compensation joint should be checked to ensure that the design requirements are met. Remove the protective cover and rinse it with it fully open.
2. Pipeline cleaning: Clean the pipeline to ensure that the pipeline and joints are clean and free of impurities. At the same time, it is also necessary to check the model and specification of the compensation joint to ensure that it meets the requirements of the pipeline.
3. Installation position: Install the compensating joint on the pipeline in the horizontal or vertical direction, and ensure that the pipeline near the installation point should not sag or be affected by external force.
4. Connecting bolts: Use the specified torque to cross-tighten the flange connecting bolts to ensure that the compensation joint is closely connected to the pipeline.
5. Adjust the length: Adjust the connection length between the two ends of the product and the flange to ensure that the compensating joint can absorb the thermal expansion and contraction and vibration of the pipeline.
6.Whole machine test: The whole machine is tested according to the specified signal to prevent vibration caused by transportation, and can be installed only after passing the test.
7. Regular inspection and maintenance: In order to ensure that the compensation joint can work stably for a long time, regular inspection is required. Generally speaking, it is recommended to check once every six months, mainly to check whether the displacement and rebound amount of the compensation joint are normal. If any problems are found, they need to be dealt with promptly.
Inventory display
Product Composition
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
40000000-60000000
Employee Number:
100~150
Ecer Certification:
Verified Supplier
The company adheres to the business philosophy of "customer satisfaction is our first duty, all employees are responsible for creating quality, continuous improvement sets new heights, honest service builds reputation", and wholeheartedly provides high-quality products and profes... The company adheres to the business philosophy of "customer satisfaction is our first duty, all employees are responsible for creating quality, continuous improvement sets new heights, honest service builds reputation", and wholeheartedly provides high-quality products and profes...
Get in touch with us
Leave a Message, we will call you back quickly!