Payment Terms | L/C, T/T, Western Union |
Supply Ability | 10000/set per day |
Delivery Time | 10-25days |
Packaging Details | steel pallet |
Name | Self Climbing Scaffolding Safety Mesh |
Material | Galvanzied steel plate,steel plate |
Process Technology | Perforated Punching Electrostatic Spraying |
Colour | Blue Yellow Green Red Etc |
Style | Frame mesh panel |
Specifications | 0.4-1.0mm customizes |
Surface treatmest | Powder Coated |
Size | 1mX2m 1mX1.8m customizes |
Brand Name | Aoben |
Model Number | Aoben-Safety Mesh-12 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Perforated Metal Safety Screens Construction Custom
Metal Perforated Building Site Construction Safety Screens 1mX1.8m
Custom Self Climbing Scaffold System Industrial Safety Screens 1.2X1.8m
Protective Circular Hole Safety Screens Construction Dust Proof ISO9001
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 10000/set per day |
Delivery Time | 10-25days | Packaging Details | steel pallet |
Name | Self Climbing Scaffolding Safety Mesh | Material | Galvanzied steel plate,steel plate |
Process Technology | Perforated Punching Electrostatic Spraying | Colour | Blue Yellow Green Red Etc |
Style | Frame mesh panel | Specifications | 0.4-1.0mm customizes |
Surface treatmest | Powder Coated | Size | 1mX2m 1mX1.8m customizes |
Brand Name | Aoben | Model Number | Aoben-Safety Mesh-12 |
Certification | ISO9001 | Place of Origin | China |
High Light | Scaffolding Protection Screen Construction ,protection screen construction 1m ,building site screens 2m |
Powder Coated Perforated Self Climbing Scaffolding Construction Safety Screens For Building
The Self Climbing Scaffolding Safety Mesh is a kind of steel safty mesh for high building construction,to promose the safte for workers.
The Powder coated perforated punching self climbing scaffolding safety mesh is a new type of scaffold technology which is developed rapidly at the beginning of this century. It changes the work from high to low, and the work from hanging to the inside of the frame, which has a remarkable low-carbon character, high-tech content and more economic, safer, more convenient and so on. The main body of climbing frame can realize the function of low-build and high-use. At the bottom of the main body of the building, one-time Assembly is completed, attached to the building, with the increase of the floor height and continue to upgrade, the entire operation process does not take up other lifting machinery, greatly improving construction efficiency, and the field environment more humane, easier management and maintenance, civilized operation effect more prominent.
Climbing scaffold is a new type of scaffold system, which is applied to the construction protection of high-rise and super-high-rise buildings with the same shape The utility model is suitable for the construction of complex shapes such as cast-in-place Shear Wall, frame, circular arc balcony, cantilever slab, etc. .
If you are interested in the self climbing scaffolding safety mesh,you need tell us the plate thickness(0.4mm-1.0mm),the frame pipe thickness and specification(20mmX20mmX1.0mm or others).Also the width and length and colour,if better,you have drawing will be the best for us to help you to caculate the cost.
Why the self climbing scaffolding safety mesh popular now?
1, Save Materials: only set up 4 ~ 5 times the floor height, greatly reduce the use of scaffolding;
2, Save Labor: Do not need to transport materials, lifting fully automated;
3, Strong Independence: rely on their own equipment, do not occupy the vertical transport equipment;
4, Shorten the construction period: to avoid repeated construction, half-small automatic promotion in place;
5, Protection in place: The new climbing frame network height in line with the construction scope of formwork reinforcement and formwork removal support;
6, Safe and Reliable: low assembly, low removal, anti-dumping and anti-falling equipment is complete, lifting operation in the frame body;
7, Management Norms: High degree of equipment, can be managed according to the equipment, in line with the fixed law of the supporting position, easy to check; 8, Professional Operation: including machinery, electrical appliances, lifting equipment, operators must be professional training;
9, The whole application: from the bottom up to complete the three-dimensional construction, from the top down to complete the external wall decoration works;
10, Civilized Construction: targeted design, professional construction, management norms.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2021
Employee Number:
10~50
Ecer Certification:
Active Member
Our main products are perimeter safety screens,construction safety screens,formwork screen,layer chicken cage,crimped wire mesh,358 security fence,welded wire mesh fence,razor mesh fence,steel grating and expanded metal mesh,ect. Thanks for interested in Aoben fence company,we are the o... Our main products are perimeter safety screens,construction safety screens,formwork screen,layer chicken cage,crimped wire mesh,358 security fence,welded wire mesh fence,razor mesh fence,steel grating and expanded metal mesh,ect. Thanks for interested in Aoben fence company,we are the o...
Get in touch with us
Leave a Message, we will call you back quickly!