China factories

China factory - TORICH INTERNATIONAL LIMITED

TORICH INTERNATIONAL LIMITED

  • China,Jiaxing ,Zhejiang
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China High Pressure Carbon Steel Tube , Seamless Boiler Tube 3 - 22m Length
China High Pressure Carbon Steel Tube , Seamless Boiler Tube 3 - 22m Length

  1. China High Pressure Carbon Steel Tube , Seamless Boiler Tube 3 - 22m Length

High Pressure Carbon Steel Tube , Seamless Boiler Tube 3 - 22m Length

  1. MOQ: negotiable
  2. Price: Negotiable
  3. Get Latest Price
Standard ASTM, DIN
Standard2 ASTM A179-1990, DIN 17175
Grade Group 10#-45#, A53-A369
Grade 10#, 20#, A179-C, A192
Thickness 2.2 - 25.4 mm
Section Shape Round
Outer Diameter(Round) 12.7 - 177.8 mm
Secondary Or Not Non-secondary
Application Boiler Pipe
Technique Cold Drawn
Surface Treatment oil
Special Pipe boiler tubes
Alloy Or Not Non-alloy
Product name High pressure DIN17175 ST 35.8 ASME SA 192 seamless boiler tube
Keywords st 35.8 seamless boiler tube
End protector Plain
Length 3-22m
Type SMLS
Usage Boiler tubes
Material Carbon steel
Brand Torich
Test E.T./U.T./H.T.
MTC En10204.3.2
Place of Origin Zhejiang, China (Mainland)
Certification ISO 9001 ISO14001

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Standard ASTM, DIN Standard2 ASTM A179-1990, DIN 17175
Grade Group 10#-45#, A53-A369 Grade 10#, 20#, A179-C, A192
Thickness 2.2 - 25.4 mm Section Shape Round
Outer Diameter(Round) 12.7 - 177.8 mm Secondary Or Not Non-secondary
Application Boiler Pipe Technique Cold Drawn
Surface Treatment oil Special Pipe boiler tubes
Alloy Or Not Non-alloy Product name High pressure DIN17175 ST 35.8 ASME SA 192 seamless boiler tube
Keywords st 35.8 seamless boiler tube End protector Plain
Length 3-22m Type SMLS
Usage Boiler tubes Material Carbon steel
Brand Torich Test E.T./U.T./H.T.
MTC En10204.3.2 Place of Origin Zhejiang, China (Mainland)
Certification ISO 9001 ISO14001
High Light carbon steel seamless pipesindustrial steel pipe

medium carb High pressure DIN17175 ST 35.8 ASME SA 192 seamless boiler tubeon boiler tube

 

 

 

Applications:


for Boilers,Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions

Manufacture:Tubes are manufactured by seamless process and both hot finished and cold finished are applicable.

medium carbon boiler tube

st 35.8 seamless boiler tube

 

Heat treatment: Hot finished tubes need not be heat treated.Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher

 

DIN 17175 Grade St35.8 Chemical Compositom &Mechamical properties

 

Mn
P
S
Si
Tensile Strength
Yeild point
Elongation
0.17
0.40-1.30
0.04
0.04
0.10-0.35
Min 350-480 Mpa
Min 235Mpa
Min 25 %

 

Steel grade SA192 Chemical Composition & Mechanical properties

 

Mn
P
S
Si
Tensile Strength
Yeild point
Elongation
0.06-0.18
0.27-0.63
0.035Max
0.035Max
0.25Max
min ksi[Mpa] 47[325] 
 min ksi[Mpa] 26[180]  
≥35%   

 

 

Hardness Of A192

Brinell Hardness
Rockwell Hardness Number
 WT≥0.200in(5.1mm)
 WT<0.200in(5.1mm)
137HRB
77HRB

 

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness,                  Impact, Mictrostruture etc
8~ Packing and Stocking.

 

FAQ-600x600-0.jpg

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 















Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller

  • Year Established:

    1997

  • Total Annual:

    10million-15million

  • Employee Number:

    100~150

  • Ecer Certification:

    Verified Supplier

Who We are ? TORICH is an enterprise that has been producing precision steel pipes and steel pipe processing for over 20 years, with a factory area of approximately 20000 square meters   The main products produced are carbon steel and alloy steel grade seamless steel pipes, we... Who We are ? TORICH is an enterprise that has been producing precision steel pipes and steel pipe processing for over 20 years, with a factory area of approximately 20000 square meters   The main products produced are carbon steel and alloy steel grade seamless steel pipes, we...

+ Read More

Get in touch with us

  • Reach Us
  • TORICH INTERNATIONAL LIMITED
  • INDUSTRY AREA -HAIYAN ,JIAXING CITY ,ZHEJIANG ,CHINA
  • https://www.precisionsteeltube.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement