Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 3000 Ton/Tons per Day |
Packaging Details | In bundle with steel strip on middle, top, bottom. |
Thickness | 5-28mm |
Length | 1-12m or customized |
Flange Width | 50-300mm |
Web Width | 7-28mm |
Flange Thickness | 5-16mm |
Web Thickness | 100-900mm |
Tolerance | ±5% |
Processing Service | Bending, Welding, Decoiling, Punching, Cutting |
Brand Name | Gnee |
Model Number | Steel Structure Building |
Certification | SGS |
Place of Origin | Tianjin |
View Detail Information
Explore similar products
Length 1m Prefabricated Light Alkyd Painting Steel Building Structure
Eps Prefabricated Clean Room , Steel Structure Building
Custom Industrial Modular Multispan Steel Frame Structure Building
Multi Storey Metal Sheet 1m Length Prefabricated Steel Carport
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 3000 Ton/Tons per Day |
Packaging Details | In bundle with steel strip on middle, top, bottom. | Thickness | 5-28mm |
Length | 1-12m or customized | Flange Width | 50-300mm |
Web Width | 7-28mm | Flange Thickness | 5-16mm |
Web Thickness | 100-900mm | Tolerance | ±5% |
Processing Service | Bending, Welding, Decoiling, Punching, Cutting | Brand Name | Gnee |
Model Number | Steel Structure Building | Certification | SGS |
Place of Origin | Tianjin | ||
High Light | Sandwich Wall Panel Steel Structure Factory ,prebuilt Steel Structure Factory ,Sandwich Wall Panel factory steel buildings |
Sandwich Wall Panel Prefabricated Steel Structure Warehouse/Factory Double Span Steel Building
A large double span steel building was required for one of the UK’s largest flowers and bulbs suppliers. The building is used for the packing, sorting and storage of bulbs.
The concept
The building is cited on a green field site. We advised on footings, groundwork and the concrete floor. We also built a concrete access road and apron to the front of the building.
The solution
To achieve the floor area required for this project, the best economic solution was a double span steel building. This means that there are columns down the centre of the two spans with a valley gutter, this reduces steel cost. The columns down the centre of the building do not impact on the storage and distribution of the boxes of bulbs.
The bulbs are protected from the harsh weather by the large double span roof, but the open sides allow the air to circulate to provide natural conditions.
Design Parameters | Size: Width X length X eave height, roof slope |
1)Live load on roof(KN/M2) Wind speed(KM/H) | |
2) The function of building, the interior equipmet | |
3) The special requirement on function | |
4)Earthquake load if have. Snow load (KG/M2) 5) Demands for doors and windows | |
6)Crane (if have), Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure! |
1. Prefabricated. Fast and easy installation, time saving and labor saving.
2. Customized design, various layout, beautiful appearances, different colors for the walls and roof.
3. light weight, easy move and cost saving,
4. Removable,convenient to assemble or disassemble. Fast construction and easy installation.
5. Environmentally, recycle, no waste produced.
6. High strength, can resistance grade 8 earthquake.
water proof, fire proof; can resists strong wind and heavy snow.
7. Long life span.can be used for more than 50 years.
8. Wide span , single or multiple spans, can have a maximum span distance in 36m without middle columns.
Steel structure is the third generation construction. It combines H section beams&columns and c/z section steel profiles into the frame with the corrugated steel sheet or sandwich panel as the envelope systems. The traditional reinforced concrete construction has already been taken place by this kind of construction in developed countries these days.
We found international surface treatment system for the Steel building ( made of high steel structures ) :
We got NACE 1 and 2 level certificate as per American standard.
We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.
Steel building ( made of high steel structures ) Advantages:
1) Environmentally Friendly
Recyclable is an environmental benefit of Steel building ( made of high steel structures ) using in construction. Steel is the most recycled material in the world. Most manufacturers use recycled steel in all of their steel building materials.
2) Energy Savings
Energy efficiency is one element that points to an environmentally friendly building. Steel building ( made of high steel structures )
fit this description in many different ways. Window placement, Tinted Windows, Insulated Frames, Retarders between the foundation and concrete slab.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2008
Total Annual:
3000000-3500000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Gnee Steel Co.,Ltd (GNEE) is the affiliated company for ANGANG GROUP who are one large state-owned iron and steel group located in Henan, China. GNEE are specialized in manufacturing and supplying large quantities Seamless steel pipes and Shipping-building plates, We are provide high qu... Gnee Steel Co.,Ltd (GNEE) is the affiliated company for ANGANG GROUP who are one large state-owned iron and steel group located in Henan, China. GNEE are specialized in manufacturing and supplying large quantities Seamless steel pipes and Shipping-building plates, We are provide high qu...
Get in touch with us
Leave a Message, we will call you back quickly!