Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 3000 Ton/Tons per Day |
Packaging Details | In bundle with steel strip on middle, top, bottom. |
Thickness | 5-28mm |
Length | 1-12m or customized |
Flange Width | 50-300mm |
Web Width | 7-28mm |
Flange Thickness | 5-16mm |
Web Thickness | 100-900mm |
Tolerance | ±5% |
Processing Service | Bending, Welding, Decoiling, Punching, Cutting |
Brand Name | Gnee |
Model Number | Steel Structure Building |
Certification | SGS |
Place of Origin | Tianjin |
View Detail Information
Explore similar products
Length 1m Prefabricated Light Alkyd Painting Steel Building Structure
Eps Prefabricated Clean Room , Steel Structure Building
Custom Industrial Modular Multispan Steel Frame Structure Building
Multi Storey Metal Sheet 1m Length Prefabricated Steel Carport
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 3000 Ton/Tons per Day |
Packaging Details | In bundle with steel strip on middle, top, bottom. | Thickness | 5-28mm |
Length | 1-12m or customized | Flange Width | 50-300mm |
Web Width | 7-28mm | Flange Thickness | 5-16mm |
Web Thickness | 100-900mm | Tolerance | ±5% |
Processing Service | Bending, Welding, Decoiling, Punching, Cutting | Brand Name | Gnee |
Model Number | Steel Structure Building | Certification | SGS |
Place of Origin | Tianjin | ||
High Light | Highly Efficient Prebuilt Warehouse ,Prebuilt Warehouse For Growing Business ,Q345 Prebuilt Warehouse |
Steel Structure Building A Highly Efficient Warehouse For A Growing Business
Exchange Engineering is an expanding family-run business and the UK’s number one supplier of spare parts for the pressure cleaning trade.
The challenge
The business wanted to improve the efficiency of their warehouse and increase their storage capacity. Providing next day delivery means high frequency traffic movement for goods in and out.
Expanding the existing warehouse was considered, but with no viable options to do this, a new building was required.
During the consultation process with Exchange Engineering, we discussed specific challenges the new building needed to overcome:
Additional storage to accommodate the growing business
Streamlined warehouse operations to make the pick process more efficient
Easy access without compromising security or health and safety.
Key Issues
The area designated for the building is at the corner of the plot where the ground sloped away. The site needed to be levelled, the team agreed a finished floor level with the client, this had to take into consideration future site development, ability for surface water to drain away and allowance for foul waste to connect to the existing system. With this requirement the team built up the stone to create a solid level base for the foundations.
Given the close proximity to the boundary, the building specification needed to accommodate a fire barrier on two sides, to protect adjacent properties in the event of a fire. This meant specifying a fire rated cladding, increase footing sizes, fire rated base plates and the team fire lined the columns to fulfil the requirements.
Solutions
With access into the building a priority, vehicle movements were considered at the design phase. The team planned both access into the building and the approach. A large roller shutter door to the front of the building accommodates vehicular access and stock movement. A pedestrian door was added to enable staff safe access, away from mechanical handling equipment. A concrete road and apron (a perimeter to the building) were also constructed.
Drainage was a concern. Slopes and falls to a drainage channel were built to ensure surface water could drain away efficiently. A soak away was constructed for both the surface water and the storm water from the roof of the building.
The large insulated steel framed building provides significantly more storage space than Exchange Engineering’s previous accommodation. The experts specified insulated cladding, as opposed to using a fleece liner, as it provides a more stable environment.
Warehouse lighting and small power outlets were required throughout. As part of our complete build solution, we carried out all the electrical works, extending the supply from the existing building into the new warehouse via trench and duct.
Onsite operations ran smoothly. The installation was carried out from scaffolding, as access was tight on two sides of the building.
Operations manager said “It was great to work on a full start to finish project, it went from an area of wasted ground to a smart usable space outside and great storage space for their growing engineering business inside”.
Steel Structure Construction Workshop for industry Material Specification
Main Steel Frame | H section steel | Q345 steel 8mm/10mm |
Welding | Automatic submerged arc welding | |
Rust removal | Sandblasting | |
Surface processing | Alkyd paint or galvanized | |
Intensive bolt | Grade 10.9 | |
Supporting System | Angle brace | L50x4, Steel Q235, processed and painted |
Cross support | Φ20, Steel Q235, processed and painted | |
Belt bar | Φ89*3, Steel Q235, processed and painted | |
Small brace | Φ12, Steel Q235, processed and painted | |
Ordinary bolt | Galvanized bolt | |
Roof | Purlin | C160*60*2.5, Steel Q235, galvanized and painted |
Outer-roof panel | Sandwich panel or corrugated steel plate | |
Transparent lighting panel | 6mm thick PVC | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | Made from 0.5mm thick, colored sheet steel | |
Gutter | Made from 0.8mm thick sheet steel | |
Rainspout | Φ110PVC | |
Walls | Purlin | C160*60*2.5,Steel Q235, painted |
Wall | sandwich panel or corrugated steel plate | |
Accessories | Glass cement, self-tapping screws, etc. | |
Edge cover | Made from 0.5mm thick, colored sheet steel | |
Axial fan | Axial fan | |
Doors & windows | Rolling door/sliding door PVC/alu/steel window |
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2008
Total Annual:
3000000-3500000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Gnee Steel Co.,Ltd (GNEE) is the affiliated company for ANGANG GROUP who are one large state-owned iron and steel group located in Henan, China. GNEE are specialized in manufacturing and supplying large quantities Seamless steel pipes and Shipping-building plates, We are provide high qu... Gnee Steel Co.,Ltd (GNEE) is the affiliated company for ANGANG GROUP who are one large state-owned iron and steel group located in Henan, China. GNEE are specialized in manufacturing and supplying large quantities Seamless steel pipes and Shipping-building plates, We are provide high qu...
Get in touch with us
Leave a Message, we will call you back quickly!