China factories

China factory - Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd

Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd

  • China,Zhuzhou ,Hunan
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace
China Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace

  1. China Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace
  2. China Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace
  3. China Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace
  4. China Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace

Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace

  1. MOQ: 1 set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 5-6 months/set
Delivery Time 5-6 months
Packaging Details wooden cases
Process temperature((℃) 700-1050
Types of coating TiC、TiN、TiCN、a-AL2O3、K-AI2O3
Brand Name Ruideer
Model Number 630,530,430
Certification CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 5-6 months/set
Delivery Time 5-6 months Packaging Details wooden cases
Process temperature((℃) 700-1050 Types of coating TiC、TiN、TiCN、a-AL2O3、K-AI2O3
Brand Name Ruideer Model Number 630,530,430
Certification CE Place of Origin China
High Light Customized Cvd Lab Vacuum FurnaceChemical Vapor Deposition Cvd Coating FurnaceCvd Coating Furnace

Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace

 

What is Chemical Vapor Deposition?

   Chemical vapor deposition is a process that involves the reaction of a volatile precursor which is injected into a chamber (typically under vacuum). The chamber is heated to a reaction temperature that causes the precursor gas to react or break down into the desired coating and bond to the material surface. Over time the coating material builds on the surface and creates a coating throughout the exposed part's surface. So for example if we wanted to bond silicon to a surface we may want to use a trichlorosilane precursor. When the trichlorosilane is heated in the coating chamber the decomposition and coating reaction may look like this.

      SiHCl3 → Si + Cl2 + HCl

 

    CVD Coating Machine is a state-of-the-art vacuum coating technique, which utilizes chemical deposition equipment to deposit a thin layer of material onto the surface of a substrate. This type of surface coating apparatus offers a wide range of coating speeds, from 0.1 to 2.0m/min. It also provides a precise and uniform coating pressure, with a pressure stability of -±2mbar. The heating system is electric heating, which ensures a stable substrate temperature for optimal coating results. The whole process is controlled by a PLC system, which ensures precise coating thickness and uniformity. This CVD Coating Machine is ideal for a variety of CVD coating applications.

 

Equipmentmodel CVD430-1250 CVD430-1600 CVD530-1250 CVD530-1600 CVD630-1250 CVD630-1600
Effective space(mm) Φ400X1250 Φ400X1600 Φ500X1250 Φ500X1600 Φ600X1200 Φ600X1600
Heating power(KW) 39 48 45 55 65 80
Quantity of heating zone 4 5 4 5 4 5
Equipment footprint(mm) 6000*5800*4800 6000*5800*5100 6500*6000*4800 6500*6000*5100 7200*6200*4800 7200*6200*5100
Process temperature(℃) 700-1050
Precursors and process gases TiCL4,AICL3,CH3CN,H2,N2,Ar,CH,CO,CO2,HCI,H2S
Types of coating TiC,TiN,TiCN,a-AL2O3,K-AI2O3
Optional equipments

1. Off gas neutralizer (incl.evacuating device);

2. Second stage gas distributor (incl.,pipeline);

3. Gas station (incl.pipeline)

 

• Design standards

 

The equipment is designed in accordance with the pressure vessel requirements of the Quality and Technical Supervision Bureau, and is qualified after pressure testing and shipped. The electrical design and construction meet national standards.

 

• Installation pre-test and pre-acceptance

 

The equipment is fully assembled in our factory, including all pipelines, vacuum pipelines, process gas pipelines, cooling water pipelines, compressed air pipelines, etc. Pre-testing can be carried out after installation. At the customer site, pipelines other than the equipment are provided by the customer. The installation also includes the connection of all cables. At the customer site, the main cable connecting the power cabinet is provided by the customer. After installation, we conduct vacuum and positive pressure leakage tests on the entire equipment, as well as mechanical and electrical function tests.

 

• Disassembly and transportation

 

The equipment will be disassembled in several large parts, packed in a standardized manner, and loaded into the transport vehicle.

 

• Customer site installation and commissioning

 

The Redel after-sales engineer will lead the team to complete commissioning, product trial burning and other work within 20 working days. The customer needs to make appropriate preparations and provide the necessary tools, such as hoisting and lifting equipment. And provide installation personnel support (it is recommended to have 1 mechanical personnel and 1 electrical personnel).

 

• Final acceptance

After installation and commissioning, the equipment can be finally accepted in accordance with the requirements of the technical contract.

 

• Training

Our after-sales engineers will provide a systematic and complete on-site training, including operation, maintenance, troubleshooting, etc.

 

• Technical data delivery

 

To ensure safe operation and equipment maintenance, the following technical data will be provided to customers:

 

1. Equipment installation layout

2. User manual

3. Spare parts list

4. Electrical drawings

5.  Component manual

 

FAQ

Are you a factory or trading company?

Q: Are you a factory or trading company?

A:We are China leading high-temperature vacuum furnace manufacturer with over 10 years’ experience.

Do you have customization or OEM service?

Q: Do you have customization or OEM service??

A:Yes,we have powerful R&D team and high-tech equipment.So we can not only supply the regular model,but also the customizable furnace as the repuirment of our clients.

What's your advantage?

Q:What's your advantage?

A:

l Quick response to your enquiry

l High quality control

l Stable supply chain

l Timely delivery

l Excellent after-sales service

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Year Established:

    2011

  • Total Annual:

    15 Million-19 Million

  • Employee Number:

    180~220

  • Ecer Certification:

    Verified Supplier

       Zhuzhou Ruideer Intelligent Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating furnace. ...        Zhuzhou Ruideer Intelligent Equipment Co., Ltd. is a manufacturer of powder metallurgy solutions for the whole industry chain. It integrates process development, production, sales and coating services of sintering furnace, PVD coating furnace and CVD coating furnace. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
  • No.755, Xianyuehuan Rd, Tianyuan District, Zhuzhou, Hunan Province
  • https://www.sinterhipfurnace.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement