Payment Terms | L/C, T/T |
Supply Ability | 2000pcs per week |
Delivery Time | 20-25 days |
Packaging Details | bags on pallets |
Material | steel & cast iron |
OEM | Yes |
Application | toattach H20 beam to waler |
Type | steel rod type |
Width | 120mm |
Width-across | 190mm |
Brand Name | HORIZON |
Model Number | flange clamp |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Alignment Clamps DRS for Connection of Peri Domino Panel Formwork System
Cast Iron Spring Clamp Concrete Forming Accessories Tensioning Wire Tie Bar
Frami Clamp Concrete Forming Accessories Connecting Doka Framed Formwork Panels
Floor Prop Adjustable Fork Head Q235 Steel Plate Stabilizing H20 Beam With OEM
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 2000pcs per week |
Delivery Time | 20-25 days | Packaging Details | bags on pallets |
Material | steel & cast iron | OEM | Yes |
Application | toattach H20 beam to waler | Type | steel rod type |
Width | 120mm | Width-across | 190mm |
Brand Name | HORIZON | Model Number | flange clamp |
Place of Origin | CHINA | ||
High Light | construction formwork accessories ,concrete wall form accessories |
Cast Flange Clamp to Attache H20 Beam onto Steel Walings, Waler Clamps
The cast flange clamp connects H20 timber beam to the steel waler at any required position. The rigid round bar stirrup and the swiveling fingers grasp and tighten the waler flanges to the H20 beam.
Mount the flange clamps with the hexagonal nuts facing downwards (towards the bottom of the formwork). This protects the nuts against soiling during pouring concrete.
Bar Ø (mm) | Width (mm) | Width-across (mm) | Weight (Kg) |
12 | 120 | 190 | 0.8 |
Wall Formwork Components:
Components | Diagram / photo | Specification / description |
Wall formwork panel | ![]() | For all vertical formworks |
H20 Timber beam | ![]() | Water proof treated |
Steel waling | ![]() | Painted, powder coated |
Flange clamp | ![]() ![]() | Galvanized |
Panel strut | ![]() | Painted |
Waling connector 80 | ![]() | Painted |
Corner connector 60x60 | ![]() | Painted |
Top scaffold bracket | ![]() | Painted, |
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
10000000-15000000
Ecer Certification:
Site Member
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural... As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...
Get in touch with us
Leave a Message, we will call you back quickly!