Payment Terms | L/C, T/T |
Supply Ability | 100 tons per week |
Delivery Time | 20-25 days |
Packaging Details | pallets, bundles, bulk |
Material | H20 beam, steel waling, climbing bracket |
OEM | Available |
Colour | yellow & blue |
Climbing type | by crane lift |
Applications | for core wall, bridges piers, etc. |
Cycle time | 5-7 days per cycle |
Brand Name | HORIZON |
Model Number | HORIZON CLIMBING SYSTEM |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Modular Self Climbing Platform Scaffold CB240 High Load Bearing Supporting Frame
Self Climbing Formwork System Versatile Backets For High Rise Buildings
Crane Lifted Jump Form Formwork 70cm Working Platform Width For Core Wall
Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 100 tons per week |
Delivery Time | 20-25 days | Packaging Details | pallets, bundles, bulk |
Material | H20 beam, steel waling, climbing bracket | OEM | Available |
Colour | yellow & blue | Climbing type | by crane lift |
Applications | for core wall, bridges piers, etc. | Cycle time | 5-7 days per cycle |
Brand Name | HORIZON | Model Number | HORIZON CLIMBING SYSTEM |
Place of Origin | CHINA | ||
High Light | jump formwork system ,self climbing scaffold system |
High Efficient Climbing System for Construction of Core Wall and Bridge Piers
Climbing system CB240 is crane dependent, serving as a support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.
Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
1. Climbing bracket
2. Main platform
3. Pouring platform
4. Finishing platform
5. Roll-back system
6. Push-pull prop
7. Vertical waling
8. Anchor system
9. Formwork
|
Components | Diagram / photo | Specification / description |
Climbing bracket | ![]() | For all vertical formworks |
H20 Timber beam | ![]() | Water proof treated Height: 200mm Width: 80mm Length: as per table size |
Steel waling | ![]() | Painted, powder coated [12 steel channel
|
Flange clamp | ![]() | Galvanized To connect steel waling and H20 beams |
Panel strut | ![]() | Painted
|
Waling connector 80 | ![]() | Painted Used for formwork panels alignment |
Corner connector 60x60 | ![]() | Painted Used for forming inner corner formwork with wedge pins |
Top scaffold bracket | ![]() | Painted, severs as safety working platform
|
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
10000000-15000000
Ecer Certification:
Site Member
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural... As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...
Get in touch with us
Leave a Message, we will call you back quickly!