Payment Terms | L/C, T/T |
Supply Ability | 200 tons per week |
Delivery Time | 20-25 days |
Packaging Details | pallets, bundles, bulk |
Material | steel pipe |
OEM | Available |
Application | for safety platform |
Type | upper platform |
Supporting | sefl support |
Width | 700mm |
Height | 1200mm |
Size | customized |
Surface treatment | HDG,coated painted,Powder Coating |
Packing | Steel Pallet |
Feature | Reuses,efficient,Easy operation,high safety performance |
Brand Name | HORIZON |
Model Number | SCAFFOLD BRACKET |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Reusable Wall Forming Systems H20 Timber Adjustable Beam Clamp Tightening Steel
Easy-to-assemble Wall Formwork Systems / Panels With Steel Walers and Wood
Push Pull Braces For Plumbing Wall Formwork With Telescopic Length Upto 10 M
Vertical Wall Formwork Systems Composed With H20 Beams , Steel Walings , Plywood
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 200 tons per week |
Delivery Time | 20-25 days | Packaging Details | pallets, bundles, bulk |
Material | steel pipe | OEM | Available |
Application | for safety platform | Type | upper platform |
Supporting | sefl support | Width | 700mm |
Height | 1200mm | Size | customized |
Surface treatment | HDG,coated painted,Powder Coating | Packing | Steel Pallet |
Feature | Reuses,efficient,Easy operation,high safety performance | Brand Name | HORIZON |
Model Number | SCAFFOLD BRACKET | Place of Origin | CHINA |
High Light | concrete wall forming systems ,wall forming systems |
Construction Wall Forming Systems with Top Scaffold Brackets as Safety Platform
Personnel safety is always the first important thing when assembling and using the formwork systems. The top scaffold brackets perform as stable and safe working platforms at high elevations, especially for workers when pouring concrete or installing different elements on top of the formwork.
These work should be carried out from safe and stable work platforms that prevent workers falling.
Using the top scaffold bracket, working and concreting platforms are mounted to the wall formwork. This consists of: top scaffold bracket, planks, steel pipes and pipe couplers.
Normally, the top scaffold brackets for the working platform, are fixed to the vertical H20 timber beams.
Wall Formwork Components:
Components | Specification / description |
Wall formwork panel | For all vertical formworks |
H20 Timber beam | Water proof treated |
Steel waling | Painted, powder coated |
Flange clamp | Galvanized |
Panel strut | Painted |
Waling connector 80 | Painted |
Corner connector 60x60 | Painted |
Top scaffold bracket | Painted, |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
10000000-15000000
Ecer Certification:
Site Member
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural... As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural...
Get in touch with us
Leave a Message, we will call you back quickly!