Payment Terms | L/C, T/T, D/P, D/A |
Supply Ability | 18,000 square meter per month |
Delivery Time | 90 days |
Packaging Details | containers |
Application: | Warehouse, Workshop, Factory Building |
Length: | Customers' Requirements |
Working Scope: | Design,Steel Structure Fabrication, Installation |
Anti-Fire | High Anti-Fire |
Size: | Customers' Requirements |
Feature | Anti Corrosion |
Brand Name | LANGE |
Place of Origin | HeBei China |
View Detail Information
Explore similar products
OEM ODM Insulation Pre Engineered Metal Buildings Multi Storey Steel Frame
Q355B Lightweight Prefab Steel Construction Mechanic Prefab Auto Repair Shop
50M2 Prefab Metal Shop Buildings PU Insulation Prefab Steel Workshop With
Single Ridge QB355 Prefab Steel Construction Double Span Pre Manufactured
Product Specification
Payment Terms | L/C, T/T, D/P, D/A | Supply Ability | 18,000 square meter per month |
Delivery Time | 90 days | Packaging Details | containers |
Application: | Warehouse, Workshop, Factory Building | Length: | Customers' Requirements |
Working Scope: | Design,Steel Structure Fabrication, Installation | Anti-Fire | High Anti-Fire |
Size: | Customers' Requirements | Feature | Anti Corrosion |
Brand Name | LANGE | Place of Origin | HeBei China |
High Light | LANGE residential prefab metal buildings ,Residential Prefab Metal Buildings ODM ,Anti Corrosion prefabricated steel frame |
1) Structural design, detail design, computer simulation installation, factory manufacturing, site installation, etc. are carried out synchronously with a small time difference.
2) The dry construction method above the foundation has no wet operation, and the interior decoration is easy to be in place at one time. After galvanizing and coating, the profile has beautiful appearance and anti-corrosion, which is conducive to reducing the cost of enclosure and decoration.
3) It is convenient to expand the column spacing and provide greater separation space, reduce the storey height and increase the building area (the practical area of the residence can reach 92%). It has obvious advantages in storey addition, transformation and reinforcement.
No. | Item | Details of steel structure building or steel frame | |
1 | Material | Material | carbon structural steel |
2 | Produce | Lead time | Normallly 45days after down payment, also according to quantity. |
3 | Quality | Certification | Quality certificate from factory, the third party by client request. |
4 | Dimensions | Length | H beam: 4000-15000mm |
5 | Thickness: | web plate: 6-32mm | |
6 | wing plate: 6-40mm | ||
7 | Height | 200-1200mm | |
8 | Color | According to customers | |
9 | Size | MOQ is 1000 m2, width * length * eave height, |
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2020
Total Annual:
1000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Dongguang Lange Equipped Housing Co., Ltd. is a comprehensive company with large scale, specializing in steel structure designing, production and installation. Our company has various kinds of products including prefabricated house, warehouse, workshop, garage, poultry feeding buildings, contai... Dongguang Lange Equipped Housing Co., Ltd. is a comprehensive company with large scale, specializing in steel structure designing, production and installation. Our company has various kinds of products including prefabricated house, warehouse, workshop, garage, poultry feeding buildings, contai...
Get in touch with us
Leave a Message, we will call you back quickly!