China Prefabricated Steel Structure Workshop Building Project One Stop Delivery
China Prefabricated Steel Structure Workshop Building Project One Stop Delivery

  1. China Prefabricated Steel Structure Workshop Building Project One Stop Delivery
  2. China Prefabricated Steel Structure Workshop Building Project One Stop Delivery
  3. China Prefabricated Steel Structure Workshop Building Project One Stop Delivery

Prefabricated Steel Structure Workshop Building Project One Stop Delivery

  1. MOQ: 500 square meter
  2. Price: $49-79/square meter
  3. Get Latest Price
Payment Terms L/C, Western Union, T/T
Supply Ability 5000 Square Meters per Month
Delivery Time Shipped in 30 days after payment
Packaging Details By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers.4
Main Frame Welded H Steel Beam, Steel Truss Get Best Price
Product Name Workshop Steel Structure
material Q235,Q355
Life Span More than 50 years
Brand Name QHHK
Model Number Steel Structure Workshop
Certification ISO9001:2015,ISO14001:2015,ISO45001:2018
Place of Origin Shenyang

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, Western Union, T/T Supply Ability 5000 Square Meters per Month
Delivery Time Shipped in 30 days after payment Packaging Details By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers.4
Main Frame Welded H Steel Beam, Steel Truss Get Best Price Product Name Workshop Steel Structure
material Q235,Q355 Life Span More than 50 years
Brand Name QHHK Model Number Steel Structure Workshop
Certification ISO9001:2015,ISO14001:2015,ISO45001:2018 Place of Origin Shenyang
High Light Prefabricated Steel Structure WorkshopPrefab Steel Structure WorkshopPrefabricated Steel Workshop Building

Prefabricated Steel Structure Workshop Building Project One Stop Delivery Solution

 

 

The Prefabricated Steel Structure Workshop Building Project One Stop Delivery Solution use steel to form a load-bearing structure. Generally, the load-bearing structure called main frame, which are consist of beam, column and truss. The bracing system are including tie bar, knee bracing, staying bar, column bracing, as well as horizontal bracing. Together with roof system, wall system, and floor system, they are conforming an entire metal structure building.

 

 

Specification:

 

Item Steel Structure
Used

Workshop Buildings, Warehouse, Steel Horse Barns, Airport Hangars, Agricultural Steel

Buildings, Crane Buildings, etc.

Main Material Q235, Q355
Component

H Column and Beam, Horizontal / Vertical Bracing, Wall / Roof Panel, Crane and Beam,

Gutter, Rain Downpipe, Ventilation System, Canopy, Window, Door, etc.

Surface Painted or HDG or As Customer’s Requirements
Design As Customer’s Requirements
Service

High standard of engineering and service, design, manufacturer, install Steel Structure

Buildings.

 

 

Advantages of Metal Structure Workshop

 

1. Easy to assemble

The steel components arriving at the construction site are all prefabricated. During the construction process, the installation work needs to layout each structure and erect it according to the installation drawing.

The installation sequence of the steel workshop building is:

First, install the steel columns and column cross-bracing and install roof beams and roof horizontal bracing. Finally, installs the purlin and enclosure structure.

 

2. Reasonable cost:
The steel structure workshop building is light in weight, reducing the basic cost, and the construction speed is fast. It can be completed and put into production as soon as possible. The overall economic benefits are much better than that of the concrete structure

 

3. Simple construction, short construction period.
The production and installation of steel structure usually involve processing all required components in the factory and then transporting to the construction site to assemble. So the construction period is greatly shortened. A 4000 square meter building can be basically installed in only 40 days.

 

4. Energy-saving and environmentally friendly
The corrugated color steel sheet and sandwich panels used in the prefab steel structure workshop are all energy-saving materials. The steel structure also adopts dry construction during the construction process to avoid dust and environmental pollution caused by concrete construction.

 

Design Important Factors

 

1. Reasonable column spacing

Steel structure buildings mainly apply H-section steel columns and steel beams. The spacing of H-section steel columns has a significant influence on the total quantity of steel used and the total cost. We usually apply economic column distance of 6.8m to 9m, based on the normal load of the structures.
As for the projects with special needs, that can be flexibly adjusted. The determination of building height should not only meet the requirements of production equipment and production operations but also consider the height of maintenance more comprehensively.

 

2. Proper lighting and ventilation design

As the enterprises adopt intensive production, the characteristics of large-span and large-space internal spaces are becoming more and more apparent. Therefore, steel building design should pay attention to lighting and ventilation design from the perspective of humanization and energy saving. When the workshop building is tall, the openable window at the bottom of the side exterior wall is used as the primary air inlet. By installing a roof ventilator, the ventilation and lighting problems are easily solved, and the actual operation is relatively simple.

 

 

 

Difference between metal structure building and concrete building

 

1.Short construction period

In terms of the construction cycle, the steel structure has obvious advantages. The construction of the steel structure building is very fast because it is prefabricated in the factory and assembled on the construction site. Only slight weld works need be applied on site.

 

2. Environmental Friendly

After transported to the construction site, the steel components only need to be hoisted and spliced. The whole process can be operated without water. There is no flying sand and a large amount of dust, which can reduce environmental pollution and impact on nearby residents.

 

3. Favorable Cost

Steel structure buildings save construction period and labor costs compared with concrete buildings. The total cost of a steel structure building roughly is 20%~30% lower than that of traditional concrete building. What’s more, steel structure is more robust and more durable than concrete.

 

4. Structure Weight

The steel structure itself has the characteristics of lightweight. The walls and roofs of the steel structure are made of light metal building materials, which are much lighter than the brick-concrete wall and roof.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller

  • Year Established:

    2000

  • Total Annual:

    5000000-8000000

  • Employee Number:

    350~400

  • Ecer Certification:

    Verified Supplier

QHHK Steel Structure Co., Ltd. Prefabricated Steel Building Manufacturer in China Who We Are Liaoning QHHK Construction Material Technology Inc. is a 24-year steel structure engineering enterprise specializing in design, production, processing, installation, and s... QHHK Steel Structure Co., Ltd. Prefabricated Steel Building Manufacturer in China Who We Are Liaoning QHHK Construction Material Technology Inc. is a 24-year steel structure engineering enterprise specializing in design, production, processing, installation, and s...

+ Read More

Get in touch with us

  • Reach Us
  • QHHK Steel Structure
  • Room 415, A25 building SISP, Hunnan District, Shenyang, China
  • https://www.steelstructure-buildings.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement