Payment Terms | T/T |
Supply Ability | lakh |
Delivery Time | 7-15days |
Packaging Details | 27*32*10.5 |
Brand | Eltek |
Product Name | HARNESS, SHELF TO SHELF SYNC cable |
P/N | 308E35480700 |
Origin | China |
Brand Name | Elek |
Model Number | 308E35480700 |
Certification | CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Eltek Rectiverter 2U 6kVA Integrated System 6 kVA AC & 4,8 kW DC with Smartpack
Flatpack2 24v Telecom Power System CIO20405
Mean Well 19 Inch Power Supply RCP-1000-12 RC0-1000-24 1000W-1800W
Netsure 801 Telecom Power System 1000A 1500A 2000A Power Cabinet
Product Specification
Payment Terms | T/T | Supply Ability | lakh |
Delivery Time | 7-15days | Packaging Details | 27*32*10.5 |
Brand | Eltek | Product Name | HARNESS, SHELF TO SHELF SYNC cable |
P/N | 308E35480700 | Origin | China |
Brand Name | Elek | Model Number | 308E35480700 |
Certification | CE | Place of Origin | CHINA |
High Light | Eltek Harness ,Shelf To Shelf Sync Cable ,P/N 308E35480700 Shelf To Shelf Sync Cable |
Proper DC Cable Routing
Figure 10 shows the proper cable routing for circuit breaker connections. All circuit breaker cables should be routed through the cable openings to the left, when looking at the rear of the shelf, of the connection points. NOTE: Routing the cables in any other manner may harm the personnel or the system.
Circuit 9 contains four circuit breaker and twenty GMT fuse connections. All DC output connections are accessible from the rear (Figure 12), whereas circuit breakers and fuses are accessible from the front (Figure 11).
Make GMT output and return connections by using the compression screws on the GMT terminal strips accessible from the rear (Figure 12). Select wire size according to specifications in the section “DC Output Requirements” on page 10. GMT cables should be routed straight down through the cable holes just below the GMT terminal block. Torque these M3 screws to 4.5 in-lbs. Install fuses into appropriate slots in the GMT fuse block shown in Figure 11. For load output and return circuit breaker connections (positions A and B), connect lugs to the double ¼” -20 studs with 5/8” centers, accessible from the rear, as shown in Figure 12. Circuit breakers can be found behind the distribution door on the right side of the system when viewing it from the front (Figure 11). Size wires and lugs according to specifications in the section “DC Output Requirements” on page 10. Breaker cables should be routed through the cable holes on the left side of the shelf when viewing it from the rear (Figure 10). DO NOT connect an equipment load to LVD-protected output connections.
Brand | Eltek |
Product Name | Shelf To Shelf Sync cable |
Prat Name | 308E35480700 |
Origin | China |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Trading Company
Year Established:
2017
Total Annual:
4,000,000-5,000,000
Employee Number:
20~30
Ecer Certification:
Verified Supplier
Ding Ding Future Power Company provide professional solutions to the telecommunications and network power industries across Africa,the Middle East , South America and Southeast Asia clients. we have grown rapidly since our inception in 2017 as a small company for telecom after-sale serv... Ding Ding Future Power Company provide professional solutions to the telecommunications and network power industries across Africa,the Middle East , South America and Southeast Asia clients. we have grown rapidly since our inception in 2017 as a small company for telecom after-sale serv...
Get in touch with us
Leave a Message, we will call you back quickly!