Payment Terms | L/C, T/T |
Supply Ability | 10000 PCS/Month |
Delivery Time | 7-30 Days |
Packaging Details | Export Packaging |
Material | 50Mn Steel |
Technique | Casting |
Dimension | Standard |
HRC Depth | 4-10 mm |
Finish | Smooth |
Warranty Time | 12-18 Months |
Quality | High Guarantee |
Appliion | Excavator&Bulldozer |
Brand Name | YT |
Model Number | PC200/PC100/PC300 |
Place of Origin | China |
View Detail Information
Explore similar products
EX60-2 EX100 Hitachi Track Carrier Rollers Forging Casting Technique Mini
OEM Crawler Bulldozer Spare Parts Track Carrier Rollers for HITACHI EX200-3
High Durability PC200-7 KOMATSU Upper Roller Standard Maintenance Free
OEM Track Carrier Rollers for Excavators and Bulldozers at Competitive Prices
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 PCS/Month |
Delivery Time | 7-30 Days | Packaging Details | Export Packaging |
Material | 50Mn Steel | Technique | Casting |
Dimension | Standard | HRC Depth | 4-10 mm |
Finish | Smooth | Warranty Time | 12-18 Months |
Quality | High Guarantee | Appliion | Excavator&Bulldozer |
Brand Name | YT | Model Number | PC200/PC100/PC300 |
Place of Origin | China | ||
High Light | KOMATSU Undercarriage Upper Roller ,OEM 50Mn Steel Upper Roller ,OEM KOMATSU Undercarriage Parts |
The roller, which is an important part of the belt conveyor, has many kinds and large quantities and can support the conveyor belt and the weight of the material. Constituting roughly 35% of the conveyor system's overall expenditure, it is responsible for over 70% of the system's resistance, underscoring the significance of its durability. Idler components are produced in two primary materials: metallic and polymeric.
* Through quench-tempering processes to ensure excellent mechanical properties, high strength and superior wear resistance to bending and breakage.
* Surface hardness HRC40-55 for reduced wear and longer life, adding value to your products further to your business by maximizing the durability of your products.
* Precise design, carefully manufactured for proper fix easy grousing heavy loaded capacity up to 50 tons without compromising the proper functioning of the excavators reliable quality, high-cost performance, quality services. Our products, your best choice.
3. Main Dimensions of Installation
MAIN PARAMETERS
Brand | Model | Main Dimensions of Installation | Remarks | ||||||
A | B | D | S | M | N | G | |||
KOMATSU
| PC40 | 89 | 89 | 100 | 30 | ||||
PC50UU | 83 | 83 | 100 | 30 | |||||
PC75UU-2/3 | 83 | 83 | 100 | 30 | |||||
PC60-5/6 | 140 | 120 | 120 | 45 | 100 | 42 | 13.5 | ||
PC60-7 | 94 | 94 | 100 | 35 | |||||
PC100 | 120 | 120 | 120 | 45 | 110 | 42 | 13.5 | ||
PC120-3 | 120 | 120 | 120 | 45 | 110 | 42 | 13.5 | ||
PC128 | 120 | 120 | 120 | 45 | 110 | 42 | 13.5 | ||
PC130 | 120 | 120 | 120 | 45 | 110 | 42 | 13.5 | ||
PC160 | 146 | 120 | 170 | 40 | 68 | 35 | 17.5 | ||
PC200-5 | 160 | 135 | 164 | 55 | |||||
PC200-7 | 146 | 120 | 170 | 40 | 68 | 35 | 17.5 | ||
PC240LC-5 | 160 | 135 | 164 | 55 | |||||
PC300-5/6 | 200 | 168 | 210 | 58 | |||||
PC300-7 | 172 | 150 | 195 | 50 | 90 | 55 | 18 |
The models above are just for reference, many models we can't list here. we can supply more products as your requirement. Please send us your inquiry or email if you have requirements.
4. Detecting Equipment
* World-class quality
* Factory sale directly with reasonable price
* Flexible payment terms including T/T, L/C and so on
* Fast delivery within 30 days after contract established
* Professional sales team, quality inspection, and report, maritime logistics guidance
* After-sale services: video technical support, 24h online support
We Are An Industry And Trade Integration Business, Our Factory Loed In Quanzhou, And Our Sales Department Is In The Center Of Xiamen City.
We Usually Accept T/T Or L/C. Other Terms Also Could Be Negotiated.
It Depends On What You Are Buying. Normally, Our Minimum Order Is USD5000. One 20’ Full Container And LCL Container (Less Than A Container Load) Can Be Acceptable.
FOB Xiamen Or Any Chinese Port: 35-45 Days. If There Are Any Parts In Stock, Our Delivery Time Is Only 7-10 Days.
We Have A Perfect QC System For The Perfect Products. A Team Who Will Detect The Product Quality And Specifiion Piece Carefully, Monitoring Every Production Process Until Packing Is Complete, To Ensure Product Safety Into The Container.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2011
Total Annual:
10Million-20Million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
XIAMEN YINTAI MACHINERY CO., LTD. is loed in the beautiful port city of Xiamen. It is a manufacturing enterprise which is focusing on research and development, production and trade of construction machinery parts. YinTai cooperates with Chinese famous large steel mi... XIAMEN YINTAI MACHINERY CO., LTD. is loed in the beautiful port city of Xiamen. It is a manufacturing enterprise which is focusing on research and development, production and trade of construction machinery parts. YinTai cooperates with Chinese famous large steel mi...
Get in touch with us
Leave a Message, we will call you back quickly!