China factories

China factory - CHANGZHOU UNITED WIN PACK CO.,LTD

CHANGZHOU UNITED WIN PACK CO.,LTD

  • China,Changzhou ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China PGL Machine Spray Dryer Granulator One Step Vacuum Freeze Dryer 200kg H 37kw
China PGL Machine Spray Dryer Granulator One Step Vacuum Freeze Dryer 200kg H 37kw

  1. China PGL Machine Spray Dryer Granulator One Step Vacuum Freeze Dryer 200kg H 37kw
  2. China PGL Machine Spray Dryer Granulator One Step Vacuum Freeze Dryer 200kg H 37kw

PGL Machine Spray Dryer Granulator One Step Vacuum Freeze Dryer 200kg H 37kw

  1. MOQ: 1 set
  2. Price: USD
  3. Get Latest Price
Supply Ability 3 sets/ month
Delivery Time 3 months
Name Spraying Dryer Granulator
ontainer volume 2-200kg/h
Power 3-37kw
Steam Pressure 0.4-0.6mpa
Compressed air Consumption 0.4-1.8m3 /min
Steam Consumption 25-465kg/h
Compressed air Pressure Consumption 0.6mpa
Warranty 1 Year
Customized Yes
Brand Name unitedwin
Model Number PGL-B
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 3 sets/ month Delivery Time 3 months
Name Spraying Dryer Granulator ontainer volume 2-200kg/h
Power 3-37kw Steam Pressure 0.4-0.6mpa
Compressed air Consumption 0.4-1.8m3 /min Steam Consumption 25-465kg/h
Compressed air Pressure Consumption 0.6mpa Warranty 1 Year
Customized Yes Brand Name unitedwin
Model Number PGL-B Place of Origin CHINA
High Light PGL machine 200kg hspray dryer granulator 200kg hspray dryer granulator 37kw

PGL-B Spraying Dryer Granulator(One-Step Granulator) Strict Safe Protective Measures



Description:

 

1. PGL machine is suitable for Chinese traditional medicine granule, such as capsule and tablet or coating of granule

2. Multi-fluid atomizer. Particularly it is suitable for material that contains component of amylase and has strong viscosity or theral sensitive product.

3. The structure of spraying drying chamber, filtering chamber, fluid-bed and secondary air supply system has been improved greatly. It can appear the features of spraying drying deeply.

4. Designed and manufactured laid out by GMP

5. Can realize continuous spraying process of immersed paste.

6. Simple and reliable operation

7. Improve spraying and drying efficiency

8. Compared with FL, the fluid-bed is more constant and the adjusted air amount is more reasonable. The drying degree is improved and the “dead bed” is overcomed.

 


Specifications:
 

    3 5 10 20 30 40 80 120 150
Container volume L 26 50 100 220 300 420 670 1000 1500
Liquid speed kg/h 2~4 4~6 6~15 15~25 20~40 30~60 60~120 20~160 100~200
Specific gravity of liquid kg/L ≤1.3
Steam Pressure Mpa 0.4-0.6Mpa
Steam Consumption kg/h 25 50 120 160 240 280 300 380 465
Compressed air Pressure Mpa 0.6Mpa  
Compressed air Consumption m3 /min 0.4 0.6 0.9 0.9 1.1 1.1 1.3 1.6 1.8
Auxiliary blower fan KW 0.55 0.75 0.75 1.1 1.5 1.5 1.5 2.2 2.2
Installation size for reference H1(mm) 1900 2360 2680 3150 3630 3630 4120 5050 5400
H2(mm) 190 260 340 490 540 590 690 890 990
H3(mm) 1680 2140 2460 2930 3410 3410 3900 4830 5180
φ1(mm) 400 550 700 1000 1100 1200 1400 1800 2000
φ2(mm) 150 180 180 250 280 280 315 355 355
B(mm) 860 1010 1160 1460 1560 1660 1860 2260 2460
L(mm) 1050 1050 1250 1400 1450 1500 1600 1800 2000

 

 

Application:
 
 

 

 

Company Information:

 


FAQ:
 
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
 
2. How many days will you finish installing?
We will finish installation and training within 15 days.
 
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
 
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
 
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
 
6. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.


7. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.


8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2009

  • Total Annual:

    20,000,000-30,000,000

  • Employee Number:

    10~50

  • Ecer Certification:

    Verified Supplier

Company Introduction:   Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par... Company Introduction:   Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par...

+ Read More

Get in touch with us

  • Reach Us
  • CHANGZHOU UNITED WIN PACK CO.,LTD
  • 16A-103, Jintong International Industrial Park, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
  • https://www.uwplast.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement