Supply Ability | 3 sets/ month |
Delivery Time | 3 months |
Name | Spraying Dryer Granulator |
ontainer volume | 2-200kg/h |
Power | 3-37kw |
Steam Pressure | 0.4-0.6mpa |
Compressed air Consumption | 0.4-1.8m3 /min |
Steam Consumption | 25-465kg/h |
Compressed air Pressure Consumption | 0.6mpa |
Warranty | 1 Year |
Customized | Yes |
Brand Name | unitedwin |
Model Number | PGL-B |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Pharmaceutical Round Square Vacuum Dryer China Manufacturer
GHL High Speed Mixer Granulator Machine Foodstuff Vacuum Freeze Dryer 200kg
Turbojet Micro Fluid Bed Granulator Coater For Powder Granule Pellet 500kg Batch
26KW 160rpm High Speed Mixer Granulator Automated Chemical Industry
Product Specification
Supply Ability | 3 sets/ month | Delivery Time | 3 months |
Name | Spraying Dryer Granulator | ontainer volume | 2-200kg/h |
Power | 3-37kw | Steam Pressure | 0.4-0.6mpa |
Compressed air Consumption | 0.4-1.8m3 /min | Steam Consumption | 25-465kg/h |
Compressed air Pressure Consumption | 0.6mpa | Warranty | 1 Year |
Customized | Yes | Brand Name | unitedwin |
Model Number | PGL-B | Place of Origin | CHINA |
High Light | PGL machine 200kg h ,spray dryer granulator 200kg h ,spray dryer granulator 37kw |
PGL-B Spraying Dryer Granulator(One-Step Granulator) Strict Safe Protective Measures
Description:
1. PGL machine is suitable for Chinese traditional medicine granule, such as capsule and tablet or coating of granule
2. Multi-fluid atomizer. Particularly it is suitable for material that contains component of amylase and has strong viscosity or theral sensitive product.
3. The structure of spraying drying chamber, filtering chamber, fluid-bed and secondary air supply system has been improved greatly. It can appear the features of spraying drying deeply.
4. Designed and manufactured laid out by GMP
5. Can realize continuous spraying process of immersed paste.
6. Simple and reliable operation
7. Improve spraying and drying efficiency
8. Compared with FL, the fluid-bed is more constant and the adjusted air amount is more reasonable. The drying degree is improved and the “dead bed” is overcomed.
Specifications:
3 | 5 | 10 | 20 | 30 | 40 | 80 | 120 | 150 | ||
Container volume | L | 26 | 50 | 100 | 220 | 300 | 420 | 670 | 1000 | 1500 |
Liquid speed | kg/h | 2~4 | 4~6 | 6~15 | 15~25 | 20~40 | 30~60 | 60~120 | 20~160 | 100~200 |
Specific gravity of liquid | kg/L | ≤1.3 | ||||||||
Steam Pressure | Mpa | 0.4-0.6Mpa | ||||||||
Steam Consumption | kg/h | 25 | 50 | 120 | 160 | 240 | 280 | 300 | 380 | 465 |
Compressed air Pressure | Mpa | 0.6Mpa | ||||||||
Compressed air Consumption | m3 /min | 0.4 | 0.6 | 0.9 | 0.9 | 1.1 | 1.1 | 1.3 | 1.6 | 1.8 |
Auxiliary blower fan | KW | 0.55 | 0.75 | 0.75 | 1.1 | 1.5 | 1.5 | 1.5 | 2.2 | 2.2 |
Installation size for reference | H1(mm) | 1900 | 2360 | 2680 | 3150 | 3630 | 3630 | 4120 | 5050 | 5400 |
H2(mm) | 190 | 260 | 340 | 490 | 540 | 590 | 690 | 890 | 990 | |
H3(mm) | 1680 | 2140 | 2460 | 2930 | 3410 | 3410 | 3900 | 4830 | 5180 | |
φ1(mm) | 400 | 550 | 700 | 1000 | 1100 | 1200 | 1400 | 1800 | 2000 | |
φ2(mm) | 150 | 180 | 180 | 250 | 280 | 280 | 315 | 355 | 355 | |
B(mm) | 860 | 1010 | 1160 | 1460 | 1560 | 1660 | 1860 | 2260 | 2460 | |
L(mm) | 1050 | 1050 | 1250 | 1400 | 1450 | 1500 | 1600 | 1800 | 2000 |
Application:
Company Information:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
7. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2009
Total Annual:
20,000,000-30,000,000
Employee Number:
10~50
Ecer Certification:
Verified Supplier
Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par... Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par...
Get in touch with us
Leave a Message, we will call you back quickly!