Payment Terms | T/T |
Supply Ability | 4000 tons/month |
Delivery Time | around 3~6 weeks receipt signed & stamped PO and deposit |
Packaging Details | Steel parts wrapped by the plastic films and packed by plastic strips and plywood pallets |
Material Supplier | Bao steel |
Sureface treatment | Powder Epoxy-Polyester Coating |
Standard | FEM / RMI |
Steel | Q235 (GB)/S235JR (EN), Q345 (GB)/ S355JR (EN) |
Brand Name | Huade |
Model Number | HD-PR |
Certification | ISO 9001/14001 CE |
Place of Origin | Nanjing China |
View Detail Information
Explore similar products
Powder Coating Pallet Rack Shelving , Industrial Pallet Racks Heavy Duty For
High Strength Steel Warehouse Pallet Racks Heavy Duty Pallet Racking System
Industrial Selective Pallet Racking Systems Double Depth Optional Color
Industrial Storage Steel Pallet Rack Shelving Step Beam Corrosion Protection
Product Specification
Payment Terms | T/T | Supply Ability | 4000 tons/month |
Delivery Time | around 3~6 weeks receipt signed & stamped PO and deposit | Packaging Details | Steel parts wrapped by the plastic films and packed by plastic strips and plywood pallets |
Material Supplier | Bao steel | Sureface treatment | Powder Epoxy-Polyester Coating |
Standard | FEM / RMI | Steel | Q235 (GB)/S235JR (EN), Q345 (GB)/ S355JR (EN) |
Brand Name | Huade | Model Number | HD-PR |
Certification | ISO 9001/14001 CE | Place of Origin | Nanjing China |
High Light | S355JR modular pallet racking ,2500Kg stackable pallet racks ,2500Kg S355JR Pallet Rack Shelving |
2500 Kg Heavy Load S355JR Steel Pallet Rack Shelving Storage With Narrow Aisle
Pallet Rack – Improve Your Storage Efficiency
The space you have available for storage doesn’t just include floor space. When things get tight on the ground, most buildings still have plenty of unused vertical space. All you have to do is look upward to see that most of the available space in a building is higher than we can reach.
Without pallet rack, you can only stock items as high as you can reach. Huade racking system make it possible to tap into your unused vertical space, making your storage more efficient.
Huade Advantages:
- HUADE unique design for the normal racking system and automated storage systems
- Reliable raw material and electric components and more stable structure
- OEM Available: we are able to manufacture according to your design or ideas.
- Services: our responsibility is to provide the most reliable products with zero worry
- Delivery time: Reasonable procurement, production, quanlity control schedule ensure faster delivery time
- Besides theoretical calculation, realistic tests of the load capacities, failure tests have been done a lot to vertify the theoretical calculation.
- HUADE refuses producing any product or system that will keep the people in danger.
- HUADE never offer lowest price by sacrificing the quality of our racking, automated storage systems
- HUADE offers turkey solution from designing, procurement, manufacturing and after-sevices.
- For some automated storage systems, HUADE can supply the electric control system and software warehouse management system
Contact us for getting a same-day quote!
Packaging Details
Exporting standard package for bulk cargo and full container goods, wood carton, film, form, etc.
One 40GP container could load about 20-25 ton material( about 55CBM);
20GP can load about 15 ton of goods( about 25 CBM)
FAQ
1. Q: Where is your factory located? How can I visit there?
A: Our factory is located in Nanjing of China, No.111, Hou Jiao Road, Science Park, Jiangning District, Nanjing, China 211122.
We sincerely welcome you to visit our factory!
2. Q:Does all racks produced by your company?
A: Yes, we're a DIRECT MANUFACTURE with more than 27 years experience, main products including Intensive Auto-storage system, Automated Mobile Racking system, Various of light/medium/heavy weight rack, and Mezzanine, Cantilever etc. All products are 100% produced by ourselves.
3. Q: What is the term of payment?
A: 30% depoisit by T/T and balance upon receipt the copy of BL.
4. Q: What is delivery time?
A: Simple and standard products: within 20 or 25 days upon receipt the deposit. Complicated and Automated storage systems: within 40 to 50 days upon receipt the deposit.
5. Q: Which port will be used as loading port?
A: We are closed to Nanjing port. All the products will be shipped by the feeder vessal from Nanjing port to Shanghai port to catch the mother vessel there. If you need the goods to be shipped quickly, we are able to send the goods by trailer on road to Shanghai.
6. Q: Are you able to provide installation service?
A: We have mature installation team with rich project experience. For some complicated cases, our engineer could come to project site and help clients for installation work. Normally, we can offer solution for your problem through email, mob and video call within 24 hours.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
1993
Total Annual:
45.500,000-53,000,000
Employee Number:
350~400
Ecer Certification:
Site Member
Nanjing HUADE Storage Equipment Manufacturing Co., Ltd was established in March, 1993. We are pioneered in rack manufacturing industry, and are one of the earliest professional manufacturer specializing in logistics storage systems, including warehouse planning, design, manufacturing and installing.... Nanjing HUADE Storage Equipment Manufacturing Co., Ltd was established in March, 1993. We are pioneered in rack manufacturing industry, and are one of the earliest professional manufacturer specializing in logistics storage systems, including warehouse planning, design, manufacturing and installing....
Get in touch with us
Leave a Message, we will call you back quickly!