Beijing Qinrunze Environmental Protection Technology Co., Ltd.
Payment Terms | D/P, T/T |
Supply Ability | 1 per week |
Delivery Time | 3-5 working days |
Packaging Details | NONE |
Brand Name | QRZ |
Model Number | Process Project Proposal |
Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
Payment Terms | D/P, T/T | Supply Ability | 1 per week |
Delivery Time | 3-5 working days | Packaging Details | NONE |
Brand Name | QRZ | Model Number | Process Project Proposal |
Place of Origin | China | ||
High Light | Sewage Treatment Project Unit Quotation ,Sewage Treatment Project Operating Costs ,Sewage Treatment Project Introduction |
Provide process technical support:
1. Include basic information, design scale, inlet water quality, discharge requirements, and other requirements.
2. Include preliminary process flow diagram and explanation.
3. Contains roughly the main equipment units and main equipment.
4. Provide a list of main buildings and dimensions
5. Main indicators including preliminary estimated total price or unit quotation list, electricity consumption, operating costs, land area, etc.
Service standards:
1. Provide process route, flowchart, and main supporting explanations
2. Responsible for ensuring that the process meets the owner's requirements
3. Provide a list of major equipment or units
4. Provide the main dimensions of buildings and structures
5. Provide main indicators such as land occupation, investment, freight, and electricity consumption.
What the customer needs to provide:
1. Project location, basic inflow water quality or industry category, design scale and other operating conditions. Provide the completion drawings of various specialties of the existing sewage station for renovation (optional), reasons for renovation/existing problems, actual inflow and outflow water quantity and quality, process and equipment operation status, etc.
2. Emission/reuse standard requirements, including water, gas, slag/mud.
3. Floor area, size, and surrounding environment (optional)
4. The general budget concept of the owner (optional)
5. Recommended or preferred process by the owner (optional)
6. Pre project materials (environmental impact assessment, feasibility study, etc.)+(preferably available, optional)
7. Time requirements
8. Customer's own introduction materials, etc. (if needed by the customer).
Plan duration and delivery format:
1. 3-5 working days.
2. PDF electronic version.
Fee standard:
1. 1500-6000 yuan.
2. Charge 0.1% of the total project investment. The fee for the 1500 to 6000 interval above will be calculated based on actual costs. Fees will be charged based on the first two standards for items below or exceeding.
3. Calculate separately for special or complex processes.
4. The renovation project will be increased by 5-20% based on the above foundation.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2009
Total Annual:
10000-1000000
Employee Number:
100~500
Ecer Certification:
Verified Supplier
Qinrun Environmental Protection is a high-tech company that has been operating in China for 20 years. The company integrates scientific research and development, design consulting, manufacturing, construction, and operation, providing comprehensive environmental governanc... Qinrun Environmental Protection is a high-tech company that has been operating in China for 20 years. The company integrates scientific research and development, design consulting, manufacturing, construction, and operation, providing comprehensive environmental governanc...
Get in touch with us
Leave a Message, we will call you back quickly!