Supply Ability | 3 Sets per Month |
Delivery Time | One months after receipt of advance payment |
Packaging Details | LCL |
Power | Zinc Flake Coating Machine |
Max Loading | 150kg with the basket |
Max Centrifugal Speed | 280r/min |
Min Centrifugal Speed | 50 r/min |
Tilting Obliquity | 85° |
Centrifugal Speed/Tilting | ≤80r/min |
Weight | 7MT |
Working Space | 2300mm*3050mm*2800mm |
Brand Name | JUNHE |
Model Number | DST TS 750 |
Certification | ISO9001 TS16949 CE |
Place of Origin | Changzhou in china |
View Detail Information
Explore similar products
Semi Automatic Zinc Flake Coating Machine Metal Coating Machine Easy Operate
Metal Hardware Vacuum PVD Zinc Flake Coating Machine
Blue Color Large Loading Zinc Flake Coating Equipment PLC Control
Oil Based Seal Large Loading Zinc Flake Coating Machine
Product Specification
Supply Ability | 3 Sets per Month | Delivery Time | One months after receipt of advance payment |
Packaging Details | LCL | Power | Zinc Flake Coating Machine |
Max Loading | 150kg with the basket | Max Centrifugal Speed | 280r/min |
Min Centrifugal Speed | 50 r/min | Tilting Obliquity | 85° |
Centrifugal Speed/Tilting | ≤80r/min | Weight | 7MT |
Working Space | 2300mm*3050mm*2800mm | Brand Name | JUNHE |
Model Number | DST TS 750 | Certification | ISO9001 TS16949 CE |
Place of Origin | Changzhou in china | ||
High Light | Zinc Coating Machine ,Metal Coating Machine |
High Speed Zinc Flake Coating Machine For Metal Flake Paint 280r/Min
Main Units | |||
No. | Description | QNT | Unit |
1 | Spin-Tilting Unit | 1 | Set |
2 | Hydraulic & Oil Press Supply Unit | 1 | Set |
3 | Controlling & Operating Cabinet | 1 | Set |
4 | Basket | 2 | PC |
5 | Dip / Pumping Barrel with Cooling jecket | 1 | set |
6 | Dip Barrel Lifting Platform Unit | 1 | set |
7 | Lift-weight-loading Unit | 1 | set |
8 | One-Arm Forwarding Platform | 1 | set |
9 | Two-Arms Forwarding Platform | 1 | set |
10 | Unloading Platform | 1 | set |
11 | Linking Feeder | 1 | set |
1 | Spin-Tilting Unit | |
Function | Dip ,Spin and Tilting+spin / Remowal excess solution | |
Main Parameter | ||
Power : | 1.1kw+5.5kw | |
Max Loading | 150kg with the basket | |
Max Centrifugal Speed | 280r/min | |
Min Centrifugal Speed | 50 r/min | |
Tilting Obliquity | 85° | |
Centrifugal Speed/Tilting | ≤80r/min | |
Weight | 7MT | |
Working Space | 2300mm*3050mm*2800mm | |
2 | Hydraulic & Oil Press Supply Unit | |
Function | Supplying hydraulic power to Unit 1; 6 and 8; | |
Main Parameter | ||
Power | 5.5kw | |
Max Pressure Supply : | 15MPa | |
Max Working Flow | 20L/Min | |
Weight | 1500kg | |
Working Space | 1050x950x1050 mm | |
3 | Controlling & Operating Cabinet | |
Function | Operating and Controlling the whole coating units running. | |
Main Parameter | ||
Data/Processing Storage | 2M | |
Operation Panel : | Touch Screen | |
Language | Chinese/English/ Loacl Language | |
Weight | 700kg | |
Working Space | 2500 x 550x1880mm | |
4 | Basket | |
Function | Loading workpieces for dipping & spining | |
Main Parameter | ||
Diameter of Basket | Φ750 mm*450 mm | |
Lated Loading | 80kg | |
Weight | 42kg | |
5 | Dip / Pumping Barrel with Cooling jecket | |
Function | Stirring & filtering to keep the solution in good working condition. | |
Main Parameter | ||
Barrel Construction | Double-bowl with tempreture contorl system | |
Max Loading | 150 L | |
Stirring & Fitering time | Adjustable | |
Meassurement / outside | Ø900 x Ø1200 x 945 mm | |
Diemeter of Rim & bottom | Ø930mm & Ø790mm | |
Weight | 500kg | |
6 | Dip Barrel Lifting Platform Unit | |
Function | Lifting the dip/pumping barrel(Unit 5) in the dipping position | |
Main Parameter | ||
Lated lifting capacity | 450kg | |
Max height of lifting | 900m | |
Weight | 800kg | |
Meassurement: | 1080 x 925 x 1600 mm | |
7 | Lift-weight-loading Unit | |
Function | Lift and load the workpieces into the basket , according to the pre-setting weight data. | |
Main Parameter | ||
Power | 2.2kw | |
Max Lifting | 500kg | |
Weight | 1500kg | |
Working Space | 750 x 1080 x3505mm | |
8 | One-Arm Forwarding Platform | |
Function | Liking up the transaction between Unit 9 with Unit 1; Unit 1 with Unit 10 & Unit 10 with Unit 9 | |
Main Parameter | ||
Power | 0.37kw | |
Max Delever Weight | 150kg | |
Delever Direction | 270° Horizontal | |
Lifting height | 100mm | |
Weight | 500kg | |
Working Space | Ø3.5m | |
9 | Two-Arms Forwarding Platform | |
Function | Transfer the basket to One-Arm Forwarding Platform | |
Main Parameter | ||
Power | 0.37kw | |
Max Delever Weight | 150kg | |
Delever Direction | 360° Horizontal | |
Weight | 500kg | |
Working Space | Ø2.5m | |
10 | Unloading Platform | |
Function | Unloading the workpieces coated out of the basket onto the Linking Feeder | |
Main Parameter | ||
Power | 0.37kw | |
Max Delever Weight | 150kg | |
Max Angle of Rolling | 270° | |
Weight | 1000kg | |
Working Space | 1720 x 880 x 2180mm | |
11 | Linking Feeder | |
Function | Spreading and forwarding the workpieces onto the mesh belt of furnace | |
Main Parameter | ||
Power | 0.75kw | |
Effective Width of Mesh Belt : | 800mm | |
Forwarding method | Program-controlled Receiving parts from the coater with high speed and unloading the parts onto the belt of furnace with low speed |
Company Details
Business Type:
Manufacturer
Year Established:
1998
Total Annual:
1300-1500
Employee Number:
200~250
Ecer Certification:
Verified Supplier
Changzhou Junhe Technology Stock Co., Ltd. is a high-tech enterprise devoted to developing industrial fine chemicals, special equipment and services solution provider which was founded in Changzhou, Jiangsu in 1998. Zinc flake microlayer corrosion protection coating is one of our core p... Changzhou Junhe Technology Stock Co., Ltd. is a high-tech enterprise devoted to developing industrial fine chemicals, special equipment and services solution provider which was founded in Changzhou, Jiangsu in 1998. Zinc flake microlayer corrosion protection coating is one of our core p...
Get in touch with us
Leave a Message, we will call you back quickly!