China factories

China factory - Henan Zhengzhou Mining Machinery CO.Ltd

Henan Zhengzhou Mining Machinery CO.Ltd

  • China,Zhengzhou ,Henan
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Novelty Structure 50TPH Vertical Grinding Mill For Powder Plant
China Novelty Structure 50TPH Vertical Grinding Mill For Powder Plant

  1. China Novelty Structure 50TPH Vertical Grinding Mill For Powder Plant
  2. China Novelty Structure 50TPH Vertical Grinding Mill For Powder Plant
  3. China Novelty Structure 50TPH Vertical Grinding Mill For Powder Plant

Novelty Structure 50TPH Vertical Grinding Mill For Powder Plant

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 30 Set / Sets per Month
Delivery Time 25 days
Packaging Details Export standard container or as customers' requirements
Product Name Vertical Grinding Mill/Vertical Roller Mill The Technical Process Is Simple
Capacity 10-50TPH
Applicable materials Cement, coal, slag, ore, etc
Application Powder Plant, Cement Production Line, etc.
Color Customized
Service Design, Manufacturing, Sales
Motor type AC Motor
Advantage High degree of automation
Brand Name ZK Corp
Model Number 1200-2600(mm)
Certification CE ISO Certification
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 30 Set / Sets per Month
Delivery Time 25 days Packaging Details Export standard container or as customers' requirements
Product Name Vertical Grinding Mill/Vertical Roller Mill The Technical Process Is Simple Capacity 10-50TPH
Applicable materials Cement, coal, slag, ore, etc Application Powder Plant, Cement Production Line, etc.
Color Customized Service Design, Manufacturing, Sales
Motor type AC Motor Advantage High degree of automation
Brand Name ZK Corp Model Number 1200-2600(mm)
Certification CE ISO Certification Place of Origin China
High Light 50TPH Vertical Grinding MillNovelty Structure Vertical Grinding Mill50TPH Vertical Roller Mill

Novelty Structure Vertical Grinding Mill/Vertical Roller Mill The Technical Process Is Simple

 

Operation of the Mill and its Description:
After the mill is started in the starting sequence, the material is fed at the set value, the hydraulic system is operated to drop the grinding roller, the oil pump motor of the hydraulic station is turned on, the working pressure of the hydraulic system is adjusted to balance the system, and the separator rotor speed should be adjusted to make The fineness of the product meets the requirements.(The specific method is to first adjust the separator to a higher speed, and adjust the rotor speed according to the product sampling analysis results to obtain the required fineness).

 

 

During operation, the temperature of the gas entering and exiting the mill should be adjusted according to the moisture content of the material. The greater the moisture content of the material, the higher the temperature of the gas entering and exiting the mill, but the highest temperature of the milling gas should not exceed 300°C.

 

 

Comparison between Ball Mill and Vertical Mill:

Because of the different methods and principles of ball mills and vertical mills, the energy consumption of ball mills is generally higher than that of vertical mills, but this also has certain limitations. When the grinding particle size is greater than 13μm (about 1000 mesh), vertical mills are used. The energy consumption of the mill is lower. When the grinding particle size is less than 13μm, the energy consumption of the ball mill will be lower. The main reason is that when the vertical mill is grinding, the number of times the material passes through the grinding roller and the grinding disc is only one time. The medium-sized powder produced after the rolling is more, and the fine powder is less. The unqualified ones that have been sorted by the classifier Because the fine powder is relatively light, it is difficult to fall on the grinding disc for secondary grinding. Therefore, the ultra-fine powder produced by the vertical mill has lower output and higher energy consumption. The principle of the ball mill is just the opposite. The number of pulverization and grinding is multiple and uncertain, and there is a certain degree of over-grinding. Therefore, the proportion of fine powder ground by the ball mill is also relatively high, and the output when grinding fine powder is relatively high, and the energy consumption is low.

 

 
Parameter of Cement Vertical Mill:
 
Model Grinding plate(mm) output(t/h) output(×10kt/a) Main motor power(kW)
diameter Pitch blast furnace slag cement Raw meal blast furnace slag cement Raw meal
ZKRM08.2 1200 800 1.5~2 3~4 6~8 1.5 3 5.5 55
ZKRM11.2 1500 1100 3~4 5~6 10~12 3 4.5 9 110
ZKRM13.2 1700 1300 8~9 11~13 20~22 6 9.5 17 185
ZKRM15.2 1900 1500 9~10 14~16 26~34 8 12 24 250
ZKRM17.2 2100 1700 12~14 20~23 40~50 10 17 36 355
ZKRM19.2 2300 1900 15~17 24~26 50~60 13 20 43.5 450
ZKRM20.2 2400 2000 18~20 27~30 60~75 15 22.5 55 560
ZKRM22.3 2600 2200 23~25 40~50 85~110 20 35.5 77 710

Remarks: the basic standard for vertical mill is as follow:

(1)Power consumption:slag≤25kWh/t,cement≤18kWh/t,raw meal≤9kWh/t;

(2)Moisture content:slag≤15%,cement≤3%,raw meal≤7%;

(3)Ffinished product fineness: specific surface area of slag 4200~4500cm²/g,specific surface area of cement 3300~380 cm²/g,raw meal fineness-80μmR 12~15%;

(4)Moisture content of refined powder:slag 0.5~1.0%,cement 0.5~1.0%,raw meal 0.5~1.0%;

(5)The specific installed capacity and parameters can be adjusted properly according to actual material nature.

(6)The above parameters are applicable for granular blast furnace slag, cement and raw meal and the model selection is determined by material property.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1956

  • Total Annual:

    100000-5000000

  • Employee Number:

    500~1000

  • Ecer Certification:

    Verified Supplier

Henan Zhengzhou Mining Machinery Co., Ltd. (ZK Corp) was established in 1956. The company is committed to providing innovative technology equipment and solid waste and hazardous waste recycling solutions for many countries and regions around the world. After more than 60 years of development, it has... Henan Zhengzhou Mining Machinery Co., Ltd. (ZK Corp) was established in 1956. The company is committed to providing innovative technology equipment and solid waste and hazardous waste recycling solutions for many countries and regions around the world. After more than 60 years of development, it has...

+ Read More

Get in touch with us

  • Reach Us
  • Henan Zhengzhou Mining Machinery CO.Ltd
  • 15th Fl, Bldg No.13, National University Science Park(East), No.279, West 3# Ring Rd, Zhengzhou, China
  • https://www.zk-kiln.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement