Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 50,000 Tons per year |
Delivery Time | According to the order |
Surface Protection | Alkyd Painted or hot dip galvanized |
advantage | fast delivery;easy to install |
Brand Name | Great Wall |
Model Number | CB100 and CB200 |
Certification | ISO9001, BV,SGS,CCIC,CNAS,FORM E,CO,CE |
Place of Origin | China |
View Detail Information
Explore similar products
Huge Load Bailey Bridge Components Rollers Plain / Rocking Rollers For Launching
High Tensile Bailey Bridge Steel Bearing Plate Compact 100 / Compact 200
High Stiffness Bailey Bridge Components For Move Load Bridge Bearing
Simple Structure Bridge Construction Parts Plain / Button Stringer Easy
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 50,000 Tons per year |
Delivery Time | According to the order | Surface Protection | Alkyd Painted or hot dip galvanized |
advantage | fast delivery;easy to install | Brand Name | Great Wall |
Model Number | CB100 and CB200 | Certification | ISO9001, BV,SGS,CCIC,CNAS,FORM E,CO,CE |
Place of Origin | China | ||
High Light | bailey bridge parts ,steel bridge components |
Bailey Bridge Frame
Frames are used to connect the panels togeter;
For connecting the trusses of the first and second row. For dual-row single-deck design, install one brace horizontally on the superface center of each truss (or Reinforced chord member). For dual-row dual-deck design, besides one brace installed on the superface, one more brace should be installed on the rear end montant of the upper truss (one also installed on the front end montant of the first truss. For triple-row bridge, the position and number of brace to be installed shall be the same as dual-row bridge. While installing, put the four hollow sleeves on both ends into the brace holes on the two trusses, and then fasten with bracing bolts and nuts.
There are some kinds of supporting frame.
Compact-100 Frame normally:
1.450 supporting frame(1270mm*540mm*80mm)
2.900 supporting frame(1270mm*900mm*80mm)
Compact-200 Frame normally:
1. TR Vertical supporting frame(1764mm*560mm),
2. TR horizontal supporting frame(2366mm*560mm),
3. wide QR vertical supporting frame(1764mm*794mm),
4. wide QR horizontal supporting frame(2366mm*794mm).
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2005
Total Annual:
10,000,000-20,000,000
Employee Number:
100~200
Ecer Certification:
Active Member
ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways;... ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways;...
Get in touch with us
Leave a Message, we will call you back quickly!