China factories

China factory - Zhenjiang Great Wall Heavy Industry Technology Co.,Ltd

Zhenjiang Great Wall Heavy Industry Technology Co.,Ltd

  • China,Zhenjiang ,Jiangsu
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China High Stiffness Bailey Bridge Components For Move Load Bridge Bearing
China High Stiffness Bailey Bridge Components For Move Load Bridge Bearing

  1. China High Stiffness Bailey Bridge Components For Move Load Bridge Bearing
  2. China High Stiffness Bailey Bridge Components For Move Load Bridge Bearing
  3. China High Stiffness Bailey Bridge Components For Move Load Bridge Bearing
  4. China High Stiffness Bailey Bridge Components For Move Load Bridge Bearing

High Stiffness Bailey Bridge Components For Move Load Bridge Bearing

  1. MOQ: According to the order
  2. Price:
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 50,000 Tons per year
Delivery Time According to the order
Surface Protection Alkyd Painted or hot dip galvanized
advantage fast delivery;easy to install
Brand Name Great Wall
Model Number CB100 and CB200
Certification ISO9001, BV,SGS,CCIC,CNAS,FORM E,CO,CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 50,000 Tons per year
Delivery Time According to the order Surface Protection Alkyd Painted or hot dip galvanized
advantage fast delivery;easy to install Brand Name Great Wall
Model Number CB100 and CB200 Certification ISO9001, BV,SGS,CCIC,CNAS,FORM E,CO,CE
Place of Origin China
High Light steel bridge componentstruss bridge components

Bailey Bridge  End Posts

 

1,It is erected in the both of bridge, used to move the load to bridge bearing.
2,It can be dedicated into male and female.


End posts are placed in the two ends of the bridge, used for transmitting the bridge load to the bridge brace. End post comprises male and female. While installing, they are installed to the end respectively. The two holes on the side of the end post shall connect the upper and lower chord member of the truss frame, and the upper oval hole connects the second-floor truss; there are short cantilever and kinetic hasp with locating pin on the under-part of end post for setting and fixing transom. During long distance transport, move the kinetic hasp to the post inside and fasten with bolt. Saddle-shaped pad is welded to the post bottom for its locating on the axial girder.

 

 

 

 

 

Bailey Bridge From China ;Great Wall Profile.pdf

 


 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2005

  • Total Annual:

    10,000,000-20,000,000

  • Employee Number:

    100~200

  • Ecer Certification:

    Active Member

    ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways;...     ZhengJiang Great Wall Heavy Industry Technology Co.ltd (here and after called Great Wall ) is locacted at Zhengjiang city, South of Yangtze River, belonging to Yangtze River Delta economic zone, owning railway station of Shanghai-Nanjing and Shanghai-Beijing High-speed raillways;...

+ Read More

Get in touch with us

  • Reach Us
  • Zhenjiang Great Wall Heavy Industry Technology Co.,Ltd
  • NO.103,Nanxu Road,Zhenjiang,Jiangsu,China
  • http://www.baileytrussbridge.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement